  377   Wednesday, June 12, 2013, 10:39 Travis CaveSouth Hot-CellStandard Operation  spent source tray removal

The spent source tray for TM#3 has been removed from the south hot cell and well be placed in the the hot cell ante room. To sit till maintenance day to be moved over to the vault storage tunnels.

  378   Thursday, June 13, 2013, 09:18 chad fisherSouth Hot-CellRepairTM3 Source Tray/Extraction Column Removal

TM3 Rev 2 source tray/extraction column insertion into its storage was completed yesterday and it was then removed from the hot cell and put into the anteroom until June 25th when it will be moved into the vault tunnel.

 

The Box did have 10000 counts of contamination "all over" it. It has recieved inital decontamination and is down to 1000 counts.

 

 

 

 

  379   Thursday, June 13, 2013, 09:21 chad fisherSouth Hot-CellDevelopment  Warm Cell Mock-up

the warm cell mock-up has been inserted into the warm cell and final preparation for the remote test are being made.

Attachment 1: 20130613_084421[1].jpg
20130613_084421[1].jpg
Attachment 2: 20130613_084426[1].jpg
20130613_084426[1].jpg
  380   Tuesday, June 18, 2013, 14:00 chad fisherSouth Hot-CellDevelopmentTM3 Mock-up testing / water block connections

The testing of the mock-up and tooling has commenced.

Source tray mock-up has been driven into the mock-up and the first two water block connections have been made; the first with the torque limiting 
T-handle tool and the second with the torque limiting air rachet attachment. Both seem to work well, although achieving the required torque with the manipulators proved to be near the limit of the manipulator.

 

 

  381   Wednesday, June 19, 2013, 08:15 chad fisherSouth Hot-CellDevelopmentTM3 Mock up water block connections

All water block connections on the mock-up have bben achieved. It is now ready for leak checking.

The front half of the water block jig proved extremely difficult to remove.

Attachment 1: 20130619_080806[1].jpg
20130619_080806[1].jpg
Attachment 2: 20130619_080808[1].jpg
20130619_080808[1].jpg
  382   Thursday, June 20, 2013, 13:47 Travis CaveSpent Target VaultStandard Operation  Spent Target Assay

Ten targets have been assayed or had field measurements(they were too hot to ship but were assayed the last time an assay was done) done on them  over the past two days. Of those that have been assayed we have total of ten shippable targets. See the attached PDF for the latest details of the storage vault.

Attachment 1: Vault_Storage_June_20_2013.pdf
Vault_Storage_June_20_2013.pdf Vault_Storage_June_20_2013.pdf Vault_Storage_June_20_2013.pdf Vault_Storage_June_20_2013.pdf
  383   Friday, June 21, 2013, 09:26 chad fisherSouth Hot-CellDevelopmentTM3 Mock-up Leak Check Results

The Mock-up has been leak tested after the remote connection of the water blocks and is leak tight!

Thanks everybody who contributed to its success.

  387   Wednesday, June 26, 2013, 11:03 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 UCx target heat shield

Chad and I leak checked the TM1 UCx target heat shield at SHC. No leak has been found so far.

  390   Thursday, June 27, 2013, 14:27 chad fisherSouth Hot-CellDevelopment  Polishing Cleaning tool - Water blocks

The polishing/cleaning tool prototype is now finished and appers to work great.

Thanks to Dan and Maico for the great job making my design a reality.

Attachment 1: 20130626_144941.jpg
20130626_144941.jpg
  391   Tuesday, July 02, 2013, 09:37 chad fisherSouth Hot-CellDevelopmentTM3 TM3 Rev.2 Source Tray Disposal

Tm3 Rev.2 source tary has been transfered to the vault tunnel storage.

  393   Wednesday, July 03, 2013, 08:43 chad fisherSouth Hot-CellStandard Operation  Ta#39 Transfered to spent target storage vault
  394   Wednesday, July 03, 2013, 08:44 chad fisher, Travis CaveSouth Hot-CellStandard Operation  Ta#39 Transfered to spent target storage vault

Ta#39 has been transferred to spent target storage vault. Ta#39 was placed into pail #106 and placed into spot of 4C of the spent target vault. The pail measured 95.8mSv/hr upon removal from the hot cell. See attached PDF for details.

Attachment 1: Vault_Storage_July_3_2013.pdf
Vault_Storage_July_3_2013.pdf Vault_Storage_July_3_2013.pdf Vault_Storage_July_3_2013.pdf Vault_Storage_July_3_2013.pdf
  397   Friday, July 05, 2013, 09:22 chad fisherSouth Hot-CellRepairTM3 Service Tray Water Block Inspection

I have inspected the service tray water block and suggest that they SHOULD be cleaned/polished before we install the new source tray.

The water blocks have slight water scalling to the inside of the ID of where the c seals locate.

I have taken two close up  pictures of each water block for reference and to document their current state. They can be found at http://documents.triumf.ca/docushare/dsweb/View/Collection-10841
 

  400   Tuesday, July 16, 2013, 13:09 David WangITEStandard OperationTM4 TM4 has been disconnected in ITE.

TM4 has been disconnected in ITE. All water lines on TM4 have been purged. ITE is venting now.

  401   Wednesday, July 17, 2013, 08:29 David WangConditioning StationDevelopmentTM3 TM3 leak check in CS without source tray.

Leak checked TM3 without source tray in CS this morning. The CS and TM3 vacuum: IG1(top of the TM3 service cap)4.9x E-7Torr, IG2(diagnostic box  primary)1.9XE-6 Torr. IG1S (secondary vessel)7.9X E-7Torr. The leak detector was at 0.0XE-4 torr and 0.0XE-9 atm.cc/sec level during the leak checked. All water lines quick connector fittings, NPT thread fittings, water cap seals, blue insulator seals, bellow, gauges seals, turbo-pumps, all blanket panels,and TM3 to CS vessel seal have been sprayed with helium and leak checked. No leak has been found. The TM3 is leak tight in CS.

  402   Wednesday, July 17, 2013, 10:10 David WangConditioning StationDevelopmentTM3 CS cooling and vacuum system have been turned off

CS water cooling and vacuum system have been turned off at 10:00 AM this morning.The TM3 will be disconnected and moved to silo tomorrow morning.

  412   Friday, July 26, 2013, 11:06 David WangSouth Hot-CellStandard Operation  The steel shielding plug has been put on theSHC top in target hall

to reduce the radioactive shining from  SHC Ta# 40 target.

  415   Tuesday, July 30, 2013, 14:42 David WangITEStandard OperationTM4 TM4 has been connected in ITE.

TM4 has been connected in ITE. All turbo pumps have been started now. The pumping down on TM4 and ITE is good so far. The water interlock check on TM4 is done,and everything is fine. The ITE  IG1 still couldnt be turned on even if we replaced a new TM4  IG1 at CS. The problem is on the connecting cable from ITE to electrical room or gauge controller. I talked with Friedhelm  and vacuum group will be noticed on this problem.

  416   Wednesday, July 31, 2013, 11:13 Travis CaveSpent Target VaultStandard Operation  Spent target move

Five spent targets have been removed from the storage vault and placed into the mini storage. The target placed into the mini storage are UO#3, UC#'s  3,4,5 and SIC#23. See attached PDFs for vault details.

Attachment 1: Vault_Storage_July_31_2013.pdf
Vault_Storage_July_31_2013.pdf Vault_Storage_July_31_2013.pdf Vault_Storage_July_31_2013.pdf Vault_Storage_July_31_2013.pdf
Attachment 2: Mini_Vault_Storage_July_31_2013.pdf
Mini_Vault_Storage_July_31_2013.pdf Mini_Vault_Storage_July_31_2013.pdf Mini_Vault_Storage_July_31_2013.pdf Mini_Vault_Storage_July_31_2013.pdf
  417   Wednesday, August 07, 2013, 06:47 maicodallavalleSpent Target VaultMaintenance  F-308

All the F-308's have been torqued up  and the locks installed. Ready to be moved.