Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 379     Entry time: Thursday, June 13, 2013, 09:21
Author: chad fisher 
Category: South Hot-Cell 
Type: Development 
Module:  
Target/Number:  
Subject: Warm Cell Mock-up 

the warm cell mock-up has been inserted into the warm cell and final preparation for the remote test are being made.

Attachment 1: 20130613_084421[1].jpg  1.972 MB  | Show | Hide all
Attachment 2: 20130613_084426[1].jpg  1.932 MB  | Show | Hide all
ELOG V2.9.2-2455