396
|
Thursday, July 04, 2013, 11:37 |
David Wang | ITW | Standard Operation | TM1 | UCx | I reconnected TM1 to ITW. | I reconnected TM1 to ITW on
02 July.The pumping down is good so far.
TM1 water interlock check is good also. |
|
399
|
Tuesday, July 09, 2013, 14:26 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks had been transferred from ITE to ITW | 5 shielding blocks had been transferred
from ITE to ITW. The ITW is configured
to take proton beam. |
|
400
|
Tuesday, July 16, 2013, 13:09 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. | TM4 has been disconnected in ITE. All water
lines on TM4 have been purged. ITE is venting
now. |
|
401
|
Wednesday, July 17, 2013, 08:29 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS without source tray. | Leak checked TM3 without source tray in
CS this morning. The CS and TM3 vacuum: IG1(top
of the TM3 service cap)4.9x E-7Torr, IG2(diagnostic |
|
402
|
Wednesday, July 17, 2013, 10:10 |
David Wang | Conditioning Station | Development | TM3 | | CS cooling and vacuum system have been turned off | CS water cooling and vacuum system have
been turned off at 10:00 AM this morning.The
TM3 will be disconnected and moved to silo |
|
409
|
Wednesday, July 24, 2013, 17:46 |
David Wang | Conditioning Station | Standard Operation | TM4 | Sic 29# | Started 3 turbo pumps on CS for TM4 | 3 turbo pumps on TM4 and CS have been started.
The pumping down is good so far, The TM4
PNG1 reading is more than 10 times higher |
|
411
|
Thursday, July 25, 2013, 10:08 |
David Wang | Conditioning Station | Standard Operation | TM4 | SiC #29 | TM4 HS helium pressure test andTM4 connection at CS | Bevan and I did a helium pressure test
on TM4 HS water circuit at CS. The leak detector
is pumped to the bottom scale(E-9 atm.cc/sec |
|
412
|
Friday, July 26, 2013, 11:06 |
David Wang | South Hot-Cell | Standard Operation | | | The steel shielding plug has been put on theSHC top in target hall | to reduce the radioactive shining from
SHC Ta# 40 target. |
|
415
|
Tuesday, July 30, 2013, 14:42 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE. | TM4 has been connected in ITE. All turbo
pumps have been started now. The pumping
down on TM4 and ITE is good so far. The water |
|
419
|
Thursday, August 15, 2013, 07:37 |
David Wang | ITE | Repair | TM4 | | I moved 5 shielding blocks from ITE to block storage area. | I moved5shielding blocks from ITE to block
storage area, This is a job for preparing
ITE vacuum surge investigation and leak check. |
|
434
|
Thursday, August 29, 2013, 06:48 |
David Wang | Conditioning Station | Development | TM3 | | TM3 leak check in CS with new source tray. | A huge leak had been found on HS circuit
during 60 psi helium pressurize test. Other
circuits are free of obvious major leak at |
|
447
|
Wednesday, September 11, 2013, 09:35 |
David Wang | ITW | Standard Operation | TM1 | UCx | 5 shielding blocks have been moved to ITW | I moved 5 shielding blocks to ITW this
morning .I checked the water signals in electrical
room before the moving, and everything is |
|
449
|
Wednesday, September 11, 2013, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | Started 3 turbo pumps on CS for TM3 | TM3 has been connected in CS.Three turbo-
pumps have been started. The pumping down
is fine so far. |
|
453
|
Friday, September 13, 2013, 07:49 |
David Wang | Conditioning Station | Development | TM3 | | TM3 water lines leak check at CS | I leak checked TM3 water lines at CS with
60 psi and 80psi helium. The base leak rate
is 5.0xe-9 atm.cc/sec. Each circuit 3 minutes |
|
454
|
Friday, September 13, 2013, 08:05 |
David Wang | South Hot-Cell | Repair | TM4 | | TM4 coil 1 leak check in SHC | Leak checked TM4 coil1 in SHC with Isaac
. The leak detector only can pump down to
1.5xE-7 atm.cc/sec. The leak detector got |
|
459
|
Monday, September 23, 2013, 13:55 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | window circuit leak check | This morning, Bevan and I leak checked
window circuit on TM3 at SHC after containment
box was installed. It took about 20minutes |
|
527
|
Friday, October 25, 2013, 06:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | Leak check on TM4 target heat shield | Maico and I leak checked HS circuit after
Chad installed the target. The circuit was
a little bit difficult o pump down because |
|
531
|
Thursday, October 31, 2013, 10:36 |
David Wang | ITW | Standard Operation | TM4 | | I moved 5 shielding blocks from ITE to ITW. | I moved 5 shielding blocks from ITW to
ITE. The ITW is configured to take
proton beam. |
|
536
|
Wednesday, November 06, 2013, 10:41 |
David Wang | South Hot-Cell | Repair | TM2 | | Installed 2 turbopumps on TM2 | Bevan and I installed 2 turbo pumps on
TM2. The o- ring flanges on TM2 had been
cleaned before the installation. |
|
537
|
Tuesday, November 12, 2013, 09:51 |
David Wang | ITE | Standard Operation | TM3 | | TM3 disconnection | TM3 has been disconnected this morning
and purged all HV water lines. I found
the power plug for all turbo pump fans wasnt |
|