Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 399     Entry time: Tuesday, July 09, 2013, 14:26
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx 
Subject: 5 shielding blocks had been transferred from ITE to ITW 

5 shielding blocks had been  transferred from ITE to ITW.  The  ITW is configured to take proton beam.

ELOG V2.9.2-2455