Message ID: 415     Entry time: Tuesday, July 30, 2013, 14:42
Author: David Wang 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: TM4 has been connected in ITE. 

TM4 has been connected in ITE. All turbo pumps have been started now. The pumping down on TM4 and ITE is good so far. The water interlock check on TM4 is done,and everything is fine. The ITE  IG1 still couldnt be turned on even if we replaced a new TM4  IG1 at CS. The problem is on the connecting cable from ITE to electrical room or gauge controller. I talked with Friedhelm  and vacuum group will be noticed on this problem.