Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 449     Entry time: Wednesday, September 11, 2013, 13:43
Author: David Wang 
Category: Conditioning Station 
Type: Development 
Module: TM3 
Target/Number:  
Subject: Started 3 turbo pumps on CS for TM3 

TM3 has been connected in CS.Three turbo- pumps have been started. The pumping down is fine so far.

ELOG V2.9.2-2455