Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
449
Entry time:
Wednesday, September 11, 2013, 13:43
Author:
David Wang
Category:
Conditioning Station
Type:
Development
Module:
TM3
Target/Number:
Subject:
Started 3 turbo pumps on CS for TM3
TM3 has been connected in CS.Three turbo- pumps have been started. The pumping down is fine so far.
ELOG V2.9.2-2455