Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 396     Entry time: Thursday, July 04, 2013, 11:37
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx 
Subject: I reconnected TM1 to ITW. 

 I  reconnected TM1 to ITW on 02 July.The pumping down is good so far. TM1 water interlock check is good also.

ELOG V2.9.2-2455