Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 447     Entry time: Wednesday, September 11, 2013, 09:35
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx 
Subject: 5 shielding blocks have been moved to ITW 

I moved 5 shielding blocks to ITW this morning .I checked the water signals in electrical room before the moving, and everything is fine. The argon venting systemin ITW and electrical room is ready also.

ELOG V2.9.2-2455