Thursday, August 08, 2024, 13:58, David Wang, South Hot-Cell, Standard Operation, TM3, SiC #46, TM3 SiC#46 electrical check at SHC with target on (After operation)
|
ABCD is short to 60KV bias. Othjer are ok. see attachment.
Found afterwards that this short was due to sparking through the multipin wire insulation where the wires pass behind the TBHT block "C".
See fault 17265. |
Thursday, August 08, 2024, 11:41, David Wang, South Hot-Cell, Standard Operation, TM3, SiC #46, Tm3 was moved from ITE to TCS this Tuesaday, then to SHC this morning.
|
Tm3 was moved from ITE to TCS this Tuesday, then to SHC this morning. Both moves are successful. |
Tuesday, August 06, 2024, 09:16, Frank Song, ITE, Standard Operation, TM3, SiC#46, module disconnection
|
TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon. |
Wednesday, July 24, 2024, 10:10, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer
|
5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving. |
Thursday, July 18, 2024, 11:22, Travis Cave, Spent Target Vault, Standard Operation, , UC#45, Spent Target Move
|
The UC#45 target was moved from the south hot cell to the spent target vault. It was place in Pail#292 spot 1A of the vault, was 19.5mSv/hr. Also
this pail contains the target material of UC#44. See attached PDF for more details. |
Wednesday, July 17, 2024, 15:06, Adam Newsome, Facilities, Standard Operation, , , Safety Walkaround Complete - SHC/NHC Area
|
A safety walkaround for July 2024 was completed for the B2 level by A. Newsome. No deficiencies to report.
Results can be found in the master
spreadsheet |
Tuesday, July 16, 2024, 13:14, Frank Song, ITW, Standard Operation, TM4, TiC#7, Module Connection
|
TM4 with TiC#7 was connected in ITW, all TPs are running at full speed. |
Tuesday, July 16, 2024, 11:15, David Wang, ITW, Standard Operation, TM4, TiC #7 febiad. , TM4 has been moved from TCS to ITW.
|
TM4 has been moved from TCS to ITW. the move is smooth. |
Tuesday, July 16, 2024, 11:15, David Wang, ITW, Standard Operation, TM4, TiC #7 febiad. , TM4 has been moved from TCS to ITW.
|
TM4 has been moved from TCS to ITW. the move is smooth. |
Friday, July 12, 2024, 08:51, Riley Sykes, Safe Module Parking, Maintenance, , , SMP chain guard
|
SS washers were added to all slotted holes on SMP chainguard cover plate |
Wednesday, July 10, 2024, 10:44, Riley Sykes, South Hot-Cell, Maintenance, , , Spring idler install
|
New spring idlers were installed onto rotational chain drive for SHC roof. Operation ran smoothly in both directions to full limit. Chain was noted
to have adequate slack when not on driven side. Periodic checks to confirm operation will continue in the following months to guarantee proper operation. |
Wednesday, July 10, 2024, 09:55, Adam Newsome, Safe Module Parking, Maintenance, , , Annual electrical and mechanical inspection of Safe Module Parking
|
An annual electrical and mechanical inspection was performed on the SMP today by Adam Newsome, Travis Cave, Riley Sykes, Maico Dalla Valle, and Jason
Zhang as per Work Permit I2024-07-10-1. The following items were checked:
Check condition of wiring for physical/radiation/UV damage
OK, no signs of significant damage
|
Tuesday, July 09, 2024, 16:14, Carla Babcock, ITE, Repair, , , Attempts to reduce ITE:EL trips from HV sparks 8x
|
ITE:EL has been tripping off due to HV sparks. Usually this also trips ITE:Q1/2. These are sitting in side-by-side racks.
The working theory is that HV sparks are returning to ground through the EL and quads, tripping them off. Possibly this is the result of a changed
low impedance ground path. How this change happened could be either something we did during shutdown or the changes we made in TM3, no clear evidence yet. |
Monday, July 08, 2024, 10:40, David Wang, Conditioning Station, Standard Operation, TM4, TiC#7, TM4 has been moved from SHC to TCS.
|
TM4 has been moved from SHC to TCS. The move is successfully. |
Friday, July 05, 2024, 14:13, Adam Newsome, Waste Package/Ship, Standard Operation, , , F-308 flask loading - five flasks loaded
|
Today (2024-07-05), five flasks were loaded in preparation for shipment with the following targets: SiC#43 (Pail 272), SiC#44 (Pail 275), Ta#63 (Pail
266), UC#40 (Pail 278), UC#38 (Pail 274).
The crimped lifting loop has been applied to each pail. The locks have not yet been applied to the flasks at the time of writing this log, but |
Friday, July 05, 2024, 12:50, David Wang, South Hot-Cell, Standard Operation, TM4, TiC#7, TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation .
|
TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation have been done. all results are good. I will attach the
checklist when printer is back to work.
TM4 HS line was helium pressure tested at TCS this morning. No leak. Also i leak checked TM4 top all air to vacuum seals at TCS. Everything |
Thursday, July 04, 2024, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check on TM4 UCx#45 target at SHC after operation.
|
electrical check on TM4 UCx#45 target at SHC after operation is done. see attachment. |
Thursday, July 04, 2024, 11:45, Frank Song, ITW, Standard Operation, TM4, UCx#45, module disconnection
|
TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.
TM4 move from ITW to SHC is smooth. |
Thursday, July 04, 2024, 01:20, Carla Babcock, ITE, Development, TM3, SiC#46, TM3 conditioning with protons
|
Initial Summary:
TM3 sparking behaviour in ITE has been very disruptive both with and without protons. Protons are at 60uA, target heater at 540A. Max voltage achieved
so far is 51kV, limited by time and a current limit on the BIAS supply. |
Wednesday, July 03, 2024, 14:01, David Wang, Conditioning Station, Standard Operation, TM2, , Tm2 has been moved from TCS to SW silo.
|
Tm2 has been moved from TCS to SW silo. the move is smooth. |
|