  2486   Tuesday, August 29, 2023, 14:32 Frank SongNorth Hot-CellStandard OperationTM4Ta#65electrical check/leak check

 TM4 with new target Ta#65 has been E/L checked at NHCPost.

Attachment 1: TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
  2488   Wednesday, September 06, 2023, 08:07 Frank SongITEStandard OperationTM4Ta#65Module Connection

 TM4 was connected in ITE with new target Ta#65 installed. see attachment in detail.

Attachment 1: TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
  2490   Tuesday, October 03, 2023, 07:56 Frank SongITWStandard OperationTM2Nb#11module disconnection

 TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. 

Attachment 1: TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
  2491   Tuesday, October 03, 2023, 14:28 Frank SongSouth Hot-CellStandard OperationTM2Nb#11electrical check

 An electric checked right after TM2 was moved from ITW. 

Attachment 1: TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
  2493   Thursday, October 05, 2023, 13:50 Frank SongITWStandard OperationTM2Ta#66Module Connection

 TM2 with new target Ta#66 was connected in ITW. 

Attachment 1: TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent target

TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 

Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
  2499   Tuesday, November 07, 2023, 13:55 Frank SongITEStandard OperationTM4Ta#65module disconnection

TM4 with spent target Ta#65 was disconnected in ITE and moved to SHC.

Attachment 1: TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
  2500   Wednesday, November 08, 2023, 12:14 Frank SongSouth Hot-CellStandard OperationTM4UCx#43electrical check/leak check

 TM4 with new target UCx#43 was electrical and leak checked on SHC.

Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
  2528   Monday, January 22, 2024, 14:12 Frank SongITEStandard OperationTM4UCx#43module disconnection

 TM4 with spent target UCx#43 was disconnected in ITE and is ready moved to SHC. see attachment pls.

Attachment 1: TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
  2573   Tuesday, April 30, 2024, 08:00 Frank SongSouth Hot-CellStandard OperationTM4Lp-Febiad emptyelectrical check/leak check

 David Wang made E/L checking before module moving to ITW. read attachment pls.

Attachment 1: TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
  2587   Wednesday, May 08, 2024, 14:01 Frank SongITWMaintenance  Annual clean up for ITW Faraday cage

The ITW Faraday Cage has been cleaned, this is part of Winter Shut Down job happens in ISAC-1 Electric maintenance room annually.

  2597   Thursday, May 23, 2024, 10:59 Frank SongITEStandard OperationTM3UCx#44shielding blocks transfer

 the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.

submitted WP# I2024-05-22--1

actived  WP # I2024-05-23-4

  2602   Tuesday, May 28, 2024, 13:49 Frank SongITWStandard OperationTM4UCx#45Module Connection

 TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with.

Attachment 1: TM4_with_UCx#45_connection_in_ITW_20240528.pdf
TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf TM4_with_UCx#45_connection_in_ITW_20240528.pdf
  2607   Monday, June 10, 2024, 11:02 Frank SongITWStandard OperationTM4UCx#45shielding blocks transfer

 5 shielding blocks have been transferred from ITE to ITW. 

Doc # 181007

 

  2610   Friday, June 14, 2024, 11:18 Frank SongITEStandard OperationTM3UCx#44module disconnection

 TM3 with target UCx#44 was disconnected in ITE. 

Attachment 1: TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
  2625   Tuesday, June 25, 2024, 12:49 Frank SongITEStandard OperationTM3SiC#46Module Connection

 TM3 with new target SiC#46 was connected in ITE.

Attachment 1: TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
  2628   Tuesday, July 02, 2024, 11:38 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer

 5 shielding blocks have been moved from ITW to ITE, MAA area has been secured.

  2631   Thursday, July 04, 2024, 11:45 Frank SongITWStandard OperationTM4UCx#45module disconnection

TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.

 TM4 move from ITW to SHC is smooth.

Attachment 1: TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
  2642   Tuesday, July 16, 2024, 13:14 Frank SongITWStandard OperationTM4TiC#7Module Connection

 TM4 with TiC#7 was connected in ITW, all TPs are running at full speed.

Attachment 1: TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf
TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf
Attachment 2: MicrosoftTeams-image_(65).png
MicrosoftTeams-image_(65).png