Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2488     Entry time: Wednesday, September 06, 2023, 08:07
Author: Frank Song 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#65 
Subject: Module Connection 

 TM4 was connected in ITE with new target Ta#65 installed. see attachment in detail.

Attachment 1: TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf  98 kB  | Show | Hide all
ELOG V2.9.2-2455