ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2500
|
Wednesday, November 08, 2023, 12:14 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#43 | electrical check/leak check |
TM4 with new target UCx#43 was electrical and leak checked on SHC. |
Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
|
|
2528
|
Monday, January 22, 2024, 14:12 |
Frank Song | ITE | Standard Operation | TM4 | UCx#43 | module disconnection |
TM4 with spent target UCx#43 was disconnected in ITE and is ready moved to SHC. see attachment pls. |
Attachment 1: TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
|
|
2573
|
Tuesday, April 30, 2024, 08:00 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Lp-Febiad empty | electrical check/leak check |
David Wang made E/L checking before module moving to ITW. read attachment pls. |
Attachment 1: TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
|
|
2587
|
Wednesday, May 08, 2024, 14:01 |
Frank Song | ITW | Maintenance | | | Annual clean up for ITW Faraday cage |
The ITW Faraday Cage has been cleaned, this is part of Winter Shut Down job happens in ISAC-1 Electric maintenance room annually. |
2597
|
Thursday, May 23, 2024, 10:59 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | shielding blocks transfer |
the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.
submitted WP# I2024-05-22--1
actived WP # I2024-05-23-4 |
2602
|
Tuesday, May 28, 2024, 13:49 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | Module Connection |
TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with. |
Attachment 1: TM4_with_UCx#45_connection_in_ITW_20240528.pdf
|
|
2607
|
Monday, June 10, 2024, 11:02 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | shielding blocks transfer |
5 shielding blocks have been transferred from ITE to ITW.
Doc # 181007
|
2610
|
Friday, June 14, 2024, 11:18 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | module disconnection |
TM3 with target UCx#44 was disconnected in ITE. |
Attachment 1: TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
|
|
2625
|
Tuesday, June 25, 2024, 12:49 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | Module Connection |
TM3 with new target SiC#46 was connected in ITE. |
Attachment 1: TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf
|
|
2628
|
Tuesday, July 02, 2024, 11:38 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer |
5 shielding blocks have been moved from ITW to ITE, MAA area has been secured. |
2631
|
Thursday, July 04, 2024, 11:45 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | module disconnection |
TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.
TM4 move from ITW to SHC is smooth. |
Attachment 1: TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
|
|
2642
|
Tuesday, July 16, 2024, 13:14 |
Frank Song | ITW | Standard Operation | TM4 | TiC#7 | Module Connection |
TM4 with TiC#7 was connected in ITW, all TPs are running at full speed. |
Attachment 1: TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdf
|
|
Attachment 2: MicrosoftTeams-image_(65).png
|
|
2645
|
Wednesday, July 24, 2024, 10:10 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer |
5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving. |
2646
|
Tuesday, August 06, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | module disconnection |
TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon. |
Attachment 1: TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf
|
|
2649
|
Friday, August 09, 2024, 08:11 |
Frank Song | ITW | Standard Operation | TM4 | TiC#7 | module disconnection |
TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS. |
Attachment 1: TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
|
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check |
TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment |
Attachment 1: electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
|
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check |
TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls. |
Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
|
|
2657
|
Tuesday, August 13, 2024, 14:18 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | Module Connection |
TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now. |
Attachment 1: TM2_with_Ta#67_connection_in_ITE_20240813.pdf
|
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check |
New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment. |
Attachment 1: TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
|
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer |
5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving. |