Wednesday, November 08, 2023, 12:14, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#43, electrical check/leak check
|
TM4 with new target UCx#43 was electrical and leak checked on SHC. |
Monday, January 22, 2024, 14:12, Frank Song, ITE, Standard Operation, TM4, UCx#43, module disconnection
|
TM4 with spent target UCx#43 was disconnected in ITE and is ready moved to SHC. see attachment pls. |
Tuesday, April 30, 2024, 08:00, Frank Song, South Hot-Cell, Standard Operation, TM4, Lp-Febiad empty, electrical check/leak check
|
David Wang made E/L checking before module moving to ITW. read attachment pls. |
Wednesday, May 08, 2024, 14:01, Frank Song, ITW, Maintenance, , , Annual clean up for ITW Faraday cage
|
The ITW Faraday Cage has been cleaned, this is part of Winter Shut Down job happens in ISAC-1 Electric maintenance room annually. |
Thursday, May 23, 2024, 10:59, Frank Song, ITE, Standard Operation, TM3, UCx#44, shielding blocks transfer
|
the five shielding blocks have been moved from storage area to ITE and is ready for beam delivery.
submitted WP# I2024-05-22--1
actived WP # I2024-05-23-4 |
Tuesday, May 28, 2024, 13:49, Frank Song, ITW, Standard Operation, TM4, UCx#45, Module Connection
|
TM4 with new target UCx#45 was connected in ITW this morning. pls see attachment uploaded with. |
Monday, June 10, 2024, 11:02, Frank Song, ITW, Standard Operation, TM4, UCx#45, shielding blocks transfer
|
5 shielding blocks have been transferred from ITE to ITW.
Doc # 181007
|
Friday, June 14, 2024, 11:18, Frank Song, ITE, Standard Operation, TM3, UCx#44, module disconnection
|
TM3 with target UCx#44 was disconnected in ITE. |
Tuesday, June 25, 2024, 12:49, Frank Song, ITE, Standard Operation, TM3, SiC#46, Module Connection
|
TM3 with new target SiC#46 was connected in ITE. |
Tuesday, July 02, 2024, 11:38, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer
|
5 shielding blocks have been moved from ITW to ITE, MAA area has been secured. |
Thursday, July 04, 2024, 11:45, Frank Song, ITW, Standard Operation, TM4, UCx#45, module disconnection
|
TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.
TM4 move from ITW to SHC is smooth. |
Tuesday, July 16, 2024, 13:14, Frank Song, ITW, Standard Operation, TM4, TiC#7, Module Connection
|
TM4 with TiC#7 was connected in ITW, all TPs are running at full speed. |
Wednesday, July 24, 2024, 10:10, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer
|
5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving. |
Tuesday, August 06, 2024, 09:16, Frank Song, ITE, Standard Operation, TM3, SiC#46, module disconnection
|
TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon. |
Friday, August 09, 2024, 08:11, Frank Song, ITW, Standard Operation, TM4, TiC#7, module disconnection
|
TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS. |
Friday, August 09, 2024, 16:15, Frank Song, South Hot-Cell, Repair, TM3, TiC#8, electrical check/leak check
|
TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment |
Tuesday, August 13, 2024, 08:39, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#67, electrical check/leak check
|
TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls. |
Tuesday, August 13, 2024, 14:18, Frank Song, ITE, Standard Operation, TM2, Ta#67, Module Connection
|
TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now. |
Friday, August 16, 2024, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#68, electrical check/leak check
|
New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment. |
Monday, August 19, 2024, 15:29, Frank Song, ITW/ITE, Standard Operation, TM2, Ta#67, shielding blocks transfer
|
5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving. |
|