  2528   Monday, January 22, 2024, 14:12 Frank SongITEStandard OperationTM4UCx#43module disconnection TM4 with spent target UCx#43 was
disconnected in ITE and is ready moved to
SHC. see attachment pls.
 TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf 
  2573   Tuesday, April 30, 2024, 08:00 Frank SongSouth Hot-CellStandard OperationTM4Lp-Febiad emptyelectrical check/leak check David Wang made E/L checking before
module moving to ITW. read attachment pls.
 TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf 
  2587   Wednesday, May 08, 2024, 14:01 Frank SongITWMaintenance  Annual clean up for ITW Faraday cage The ITW Faraday Cage has been cleaned,
this is part of Winter Shut Down job happens
in ISAC-1 Electric maintenance room annually.
  
  2597   Thursday, May 23, 2024, 10:59 Frank SongITEStandard OperationTM3UCx#44shielding blocks transfer the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery.
  
  2602   Tuesday, May 28, 2024, 13:49 Frank SongITWStandard OperationTM4UCx#45Module Connection TM4 with new target UCx#45 was connected
in ITW this morning. pls see attachment uploaded
with.
 TM4_with_UCx#45_connection_in_ITW_20240528.pdf 
  2607   Monday, June 10, 2024, 11:02 Frank SongITWStandard OperationTM4UCx#45shielding blocks transfer 5 shielding blocks have been transferred
from ITE to ITW. 
Doc # 181007
  
  2610   Friday, June 14, 2024, 11:18 Frank SongITEStandard OperationTM3UCx#44module disconnection TM3 with target UCx#44 was disconnected
in ITE. 
 TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf 
  2625   Tuesday, June 25, 2024, 12:49 Frank SongITEStandard OperationTM3SiC#46Module Connection TM3 with new target SiC#46 was connected
in ITE.
 TM3_with_SiC#46_connection_in_ITE_2024-06-25.pdf 
  2628   Tuesday, July 02, 2024, 11:38 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer 5 shielding blocks have been moved
from ITW to ITE, MAA area has been secured.
  
  2631   Thursday, July 04, 2024, 11:45 Frank SongITWStandard OperationTM4UCx#45module disconnectionTM4 with spent target UCx#45 was disconnected
in ITW and moved to SHC.
 TM4 move from ITW to SHC is
 TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf 
  2642   Tuesday, July 16, 2024, 13:14 Frank SongITWStandard OperationTM4TiC#7Module Connection TM4 with TiC#7 was connected in ITW,
all TPs are running at full speed.
 TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdfMicrosoftTeams-image_(65).png 
  2645   Wednesday, July 24, 2024, 10:10 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer 5 shielding blocks have been transferred
from ITE to ITW. MAA is secured again after
moving.
  
  2646   Tuesday, August 06, 2024, 09:16 Frank SongITEStandard OperationTM3SiC#46module disconnection TM3 with spent target SiC#46 was
disconnected in ITE and ready to move to
TCS soon.
 TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf 
  2649   Friday, August 09, 2024, 08:11 Frank SongITWStandard OperationTM4TiC#7module disconnection TM4 with spent target TiC#7 (dead)
was disconnected in ITW and ready to move
to TCS.
 TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf 
  2650   Friday, August 09, 2024, 16:15 Frank SongSouth Hot-CellRepairTM3TiC#8electrical check/leak check TM3 with replaced target TiC#8 has
been checked on SHC before moving to ITW.
Pls see attachment
 electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf 
  2656   Tuesday, August 13, 2024, 08:39 Frank SongSouth Hot-CellStandard OperationTM2Ta#67electrical check/leak check TM2 with new target Ta#67 had been
electric/leak checked before moving to ITE.
See attachment pls.
 TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf 
  2657   Tuesday, August 13, 2024, 14:18 Frank SongITEStandard OperationTM2Ta#67Module Connection TM2 with new target Ta#67 was connected
in ITE, all TP are running at their full
speed now.
 TM2_with_Ta#67_connection_in_ITE_20240813.pdf 
  2662   Friday, August 16, 2024, 13:29 Frank SongSouth Hot-CellStandard OperationTM4Ta#68electrical check/leak check New target Ta#68 is installed on
TM4 and be leak/electric checked. Pls see
attachment.
 TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf 
  2666   Monday, August 19, 2024, 15:29 Frank SongITW/ITEStandard OperationTM2Ta#67shielding blocks transfer 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving.
  
  2671   Tuesday, August 27, 2024, 13:30 Frank SongITWMaintenanceTM3TiC#8module disconnection TM3 is disconnected and all water
lines are purged/refilled with 50psi Nitrogen.
Pls see pics attached with.
 TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf 