373
|
Friday, May 31, 2013, 11:19 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#28 (RFQ Target) | Spent target move | Spent target SiC#28 (RFQ Target) has been
moved from the south hot to the storage vault.
The target was placed in pail #105 in spot |
|
105
|
Friday, May 18, 2012, 08:17 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#27 | SiC#27 Installed | SiC#27 has been installed onto TM4. Fit
was very good. All electrical connections
double checked with mirror. |
|
106
|
Friday, May 18, 2012, 08:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | Electrical check | TM#4 with SiC#27 has had its electrical
check. See attached PDF for details. |
|
108
|
Tuesday, May 22, 2012, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#27 | Electrical check | Electrical check of TM#4 with SiC#27 under
vacuum at that conditioning station. See
attached PDF for details. |
|
110
|
Tuesday, May 22, 2012, 10:50 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#27 | module moved | Module has been moved from conditioning
station to the east target station. Move
went well. |
|
137
|
Tuesday, July 03, 2012, 12:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | module move | TM#4 with SiC#27 moved from the east station
to the south hot cell. Fields at East MAA
were 127mSv/hr and the fields at the south |
|
142
|
Friday, July 06, 2012, 11:34 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#27 | Spent target move | SiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the |
|
37
|
Tuesday, October 25, 2011, 08:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Electrical check | TM#4 with SiC#26 HP has been checked electrically
it has passed. It was noted that the Megger
check of the Oven to Chassis (earth ground) |
|
38
|
Tuesday, October 25, 2011, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 with SiC#26 HP has been moved from
the south hot cell to the conditioning station. |
|
40
|
Friday, October 28, 2011, 08:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 moved from conditioning station to
south hot cell. For further leak checking. |
|
45
|
Monday, October 31, 2011, 08:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 with SiC#26 HP moved from the south
hot cell to the conditioning station. |
|
47
|
Wednesday, November 02, 2011, 13:12 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | SiC#26 High Powered | High Voltage (HV) testing | The silicon carbide targets voltage
was raised to 42 kV today before continuous
current draw was observed. It took roughly |
|
48
|
Friday, November 04, 2011, 11:12 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#26 High Powered | Module move | TM#4 with SiC#26 HP move from the conditioning
station to the East Target Station, move
went well. |
|
42
|
Friday, October 28, 2011, 09:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#26 HP Febiad | SiC#26 installed on TM4 | HP febiad target SiC#26 was installed onto
Tm4 on Monday morning.
"JP's" connector required |
|
99
|
Monday, May 14, 2012, 12:37 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#26 | module move | TM#4 with SiC #26 was moved from the East
Station to the South Hot Cell. Bevan was
at the helm of the PLC. There was no issue |
|
100
|
Tuesday, May 15, 2012, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 | Electrical check | Results of the electrical check of TM#4
with SiC#26 attached post beam. |
|
101
|
Tuesday, May 15, 2012, 12:14 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#26 | SiC#26 removal TM4 degredation | SiC#26 was removed from target module #4
this morning. Target shows the now standard
arc marks on the 9 pin connector housing...pictures |
19x |
103
|
Wednesday, May 16, 2012, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#26 | Spent target move | SiC #26 was moved from the south hot cell
into storage today. The target was is in
pail # 94 and was placed in slot 1B in the |
|
1789
|
Friday, September 21, 2018, 10:07 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 with SiC nano target was has been connected in ITW. | Tm2 with SiC nano has been connected in
ITW. See attachment for checklist |
|
1806
|
Tuesday, October 23, 2018, 10:45 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 was disconnected in ITW. | TM2(SiC nano) has been disconnected in
ITW. See attachment |
|