Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 422     Entry time: Monday, August 19, 2013, 10:08
Author: Anders Mjos 
Category: ITE 
Type: Repair 
Module: TM4 
Target/Number: SiC#29 
Subject: Leak Check 

All water circuits except Coil 1 were leak checked by David and Anders. No obvious signals were detected except some small possible responses. See attached notes for details.

Attachment 1: ITE_Leak_Test_2013-08-19.pdf  172 kB  | Show | Hide all
ELOG V2.9.2-2455