Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 483     Entry time: Tuesday, October 01, 2013, 10:59
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC#29 
Subject: Electrical check 

TM#4 with SiC#29 electrical check post beam see pdf for details.

Attachment 1: TM#4_elec_chk_SiC#29_SHC_post2.PDF  245 kB  | Show | Hide all
ELOG V2.9.2-2455