  2375   Friday, October 07, 2022, 14:46 Adam NewsomeSouth Hot-CellDevelopment  Addition of lift table to E-stop circuit

A modification was made to integrate the hot cell's lift table into the E-stop circuit. See work permit I2022-10-07-1

The E-stop mounted on the right side of the small enclosure adjacent to the operator station will now serve to stop the lift table's up and down motion, as well as the turntables up/down and CW/CCW motions. Functionality was checked by B. Webster (electrical services) and A. Newsome.

 

Note: it is recommended next time there is a hot cell entry to inspect whether or not the limit switch specified in the schematic is actually installed. The schematic should be updated to match the drawing.

 

Redlined electrical drawing photo attached to this e-log, and the paper drawing is left inside the lift table's control box. The schematic will be revised based on the redline updates, likes as part of work request #6342 (to integrate this drawing into the turntable controls drawing package).

Attachment 1: ISAC_SHC_Lift_Schematic_updated_20221007.jpg
ISAC_SHC_Lift_Schematic_updated_20221007.jpg
Attachment 2: PXL_20221007_185635660.MP.jpg
PXL_20221007_185635660.MP.jpg
Attachment 3: PXL_20221007_185649720.jpg
PXL_20221007_185649720.jpg
  2409   Tuesday, January 24, 2023, 14:22 David WangSouth Hot-CellStandard OperationTM4UCx#41TM4 electrical check with and without target at SHC

TM4 electrical check with UCX41target and without target at SHC.  The results are good. See attachment.

Attachment 1: TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
  2442   Friday, May 19, 2023, 09:39 Frank SongSouth Hot-CellStandard OperationTM2TiC#6leak/electrical check

 TM2 with TiC#6 was checked on SHC, see pic attached pls.

Attachment 1: TM2_with_TiC#6_leak_and_eletrical_check.png
TM2_with_TiC#6_leak_and_eletrical_check.png
  2491   Tuesday, October 03, 2023, 14:28 Frank SongSouth Hot-CellStandard OperationTM2Nb#11electrical check

 An electric checked right after TM2 was moved from ITW. 

Attachment 1: TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
  2492   Wednesday, October 04, 2023, 10:41 Frank SongSouth Hot-CellStandard OperationTM2Ta#66electrical check/leak check

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
  2498   Tuesday, November 07, 2023, 13:42 Frank SongSouth Hot-CellStandard OperationTM4Ta#65electrical check with the spent target

TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 

Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
  2500   Wednesday, November 08, 2023, 12:14 Frank SongSouth Hot-CellStandard OperationTM4UCx#43electrical check/leak check

 TM4 with new target UCx#43 was electrical and leak checked on SHC.

Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
  2503   Monday, November 20, 2023, 12:28 Eric LaheSouth Hot-CellMaintenance  Light Bulb Replacement - South Hot Cell roof lights

 3 light bulbs replaced in the ISAC South Hot Cell - North West light, South west light, and South East light bulbs. Northeast light currently still working.

 

The South East light is not working after bulb replacement. This bulb was tested using the wires from the Northeast light station and the bulb is working properly. Electrical services is being contacted to troubleshoot the cable issues. 

  2506   Monday, November 27, 2023, 12:01 chad fisherSouth Hot-CellMaintenance  Manipulator tong cable and wrist replacement

Broken tong cable on SW manipulator (serial #8106) of SHC was replaced today.

Following ISAC Hot Cell entry procedure, Document 157554, SHC was entered and wrist and tong cable were replaced with a pre-run/assembled wrist, cable and tong. It is standard to try and pre-make/load a new cable into a spare tong assembly to reduce time spent in the HC. This marks the first time a wrist has been replaced. Rationale for replacing the wrist at this time is that internal spacer A-14118 which the ting cable rides over has had grooves worn into it. This is a result of regular wear and tear but could be causing premature wear on the tong cable. Replacement is a preventative measure. This is the original wrist and spacer from the original install in 1998. The wrist that was removed will be rebuilt and swapped out with the original one on the SE manipulator (serial #7986) at a later date.

 

Parts replaced today are: New - Bottom half of wrist joint (CRL-13950), New - Tong cable (CRL-14230) and used tong assembly (CRL-18062)

Procedure took about 40 minutes. Dose received was ~0.046 uSv

  2507   Tuesday, November 28, 2023, 12:58 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - Silo to SHC

TM3 was moved from the Silo to South Hot Cell.

  2509   Wednesday, December 13, 2023, 11:42 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - TCS TO SHC

TM3 has been moved from the target conditioning station to the south hot cell.

  2516   Monday, January 08, 2024, 14:47 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - ITW to SHC

TM2 was moved from ITW to the South Hot Cell with Ta#66 target.

  2517   Tuesday, January 09, 2024, 16:10 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 Move - SHC to Silo

TM2 was moved with no target attached from the South Hot Cell to a silo.

  2522   Friday, January 12, 2024, 10:53 David WangSouth Hot-CellStandard Operation  ITW entrance module has been moved from ITW to SHC.

ITW entrance module has been moved from ITW to SHC. The move is smooth.  I cleaned entrance module tank flange and o r-ing slot.  entrance module tank flange o ring  is replaced .

  2523   Friday, January 12, 2024, 11:25 David WangSouth Hot-CellStandard OperationTM2Ta#66Ta#66 post operation electrical check at SHC

Ta#66 post operation electrical check was done at SHC this Monday. See attachment.

Attachment 1: TM2_Ta66_post__oeration_electrical_check.pdf
TM2_Ta66_post__oeration_electrical_check.pdf
  2524   Wednesday, January 17, 2024, 20:09 Carla BabcockSouth Hot-CellStandard Operation Ta#66Ta#66 post irradiation inspection

On Jan. 9 we did the PIE on Ta#66. Opened the heat shield and removed the EE. The inside of the heat shield was very black with lots of flakes falling off. The target itself looked overheated, and the container looked pretty bad for a Ta target. The outside of the EE looked perfect but after removing it there was a lot of black stuff on the side and we saw that the Re foil was curled up. Jens said during the runtime that he saw something that looked like a wire in the beam path, so maybe this was it.

Attachment 1: 20240109_100926(1).jpg
20240109_100926(1).jpg
Attachment 2: 20240109_101053.jpg
20240109_101053.jpg
Attachment 3: 20240109_102409.jpg
20240109_102409.jpg
  2529   Wednesday, January 24, 2024, 08:34 chad fisherSouth Hot-CellRepairTM4UCx#43Plating and coating from UCx#43 failure

TM4 has seen significant coating of the main standoff insulators and various other components stemming from failure in UCx#43 target. See attached pictures showing coating on containment box, support frame, main standoff insulators, standoff insulators high voltage shield etc. Note tracking marks on main standoff insulators.

 

Wednesday, January 24, 2024, 12:54 Carla's edit:

Meggered all HV components relative to HV common and HV common relative to ground. Nothing out of the ordinary, HV common to gnd was 700MOhms at 1kV. Seems whatever got onto the insulators is non-conductive, or is not as bad as it seems.

Attachment 1: IMG_2464.jpg
IMG_2464.jpg
Attachment 2: IMG_2465.jpg
IMG_2465.jpg
Attachment 3: IMG_2470.jpg
IMG_2470.jpg
Attachment 4: IMG_2471.jpg
IMG_2471.jpg
Attachment 5: IMG_2472.jpg
IMG_2472.jpg
  2533   Friday, January 26, 2024, 08:30 David WangSouth Hot-CellStandard OperationTM4 window line VCR leak check after containment box removal/installation.

Chad and I did window line VCRs leak check after containment box removal/installation.  The first  pair of  VCRs have leak. Chad changed VCRs. Both VCr fittings on window lines are completely leak free to 0.0 XE-9 atm.cc/sec now.

  2536   Friday, January 26, 2024, 16:48 Carla BabcockSouth Hot-CellStandard OperationTM4UC43UCx#43 PIE

UCx#43 PIE was done in the SHC. As expected based on electrical measurements, the target container was broken on the right side and came off easily. Despite all the black stuff seen on the containment box and source tray, the inside of the heat shield was very clean. Checked if the Re foil was curled in and didn't see anything. Looked fine other than the broken container.

  2551   Friday, March 15, 2024, 10:04 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move - SHC to NE Silo

TM3 was moved from SHC to NE silo. Cable tray was recently installed.