Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2522     Entry time: Friday, January 12, 2024, 10:53
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: ITW entrance module has been moved from ITW to SHC.  

ITW entrance module has been moved from ITW to SHC. The move is smooth.  I cleaned entrance module tank flange and o r-ing slot.  entrance module tank flange o ring  is replaced .

ELOG V2.9.2-2455