Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2503     Entry time: Monday, November 20, 2023, 12:28
Author: Eric Lahe 
Category: South Hot-Cell 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Light Bulb Replacement - South Hot Cell roof lights 

 3 light bulbs replaced in the ISAC South Hot Cell - North West light, South west light, and South East light bulbs. Northeast light currently still working.

 

The South East light is not working after bulb replacement. This bulb was tested using the wires from the Northeast light station and the bulb is working properly. Electrical services is being contacted to troubleshoot the cable issues. 

ELOG V2.9.2-2455