Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2509     Entry time: Wednesday, December 13, 2023, 11:42
Author: Adam Newsome 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number:  
Subject: TM3 Move - TCS TO SHC 

TM3 has been moved from the target conditioning station to the south hot cell.

ELOG V2.9.2-2455