2375
|
Friday, October 07, 2022, 14:46 |
Adam Newsome | South Hot-Cell | Development | | | Addition of lift table to E-stop circuit |
A modification was made to integrate the hot cell's lift table into the E-stop circuit. See work permit I2022-10-07-1
The E-stop mounted on the right side of the small enclosure adjacent to the operator station will now serve to stop the lift table's up and down motion, as well as the turntables up/down and CW/CCW motions. Functionality was checked by B. Webster (electrical services) and A. Newsome.
Note: it is recommended next time there is a hot cell entry to inspect whether or not the limit switch specified in the schematic is actually installed. The schematic should be updated to match the drawing.
Redlined electrical drawing photo attached to this e-log, and the paper drawing is left inside the lift table's control box. The schematic will be revised based on the redline updates, likes as part of work request #6342 (to integrate this drawing into the turntable controls drawing package). |
Attachment 1: ISAC_SHC_Lift_Schematic_updated_20221007.jpg
|
|
Attachment 2: PXL_20221007_185635660.MP.jpg
|
|
Attachment 3: PXL_20221007_185649720.jpg
|
|
2409
|
Tuesday, January 24, 2023, 14:22 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx#41 | TM4 electrical check with and without target at SHC |
TM4 electrical check with UCX41target and without target at SHC. The results are good. See attachment. |
Attachment 1: TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
|
|
2442
|
Friday, May 19, 2023, 09:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | TiC#6 | leak/electrical check |
TM2 with TiC#6 was checked on SHC, see pic attached pls. |
Attachment 1: TM2_with_TiC#6_leak_and_eletrical_check.png
|
|
2491
|
Tuesday, October 03, 2023, 14:28 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Nb#11 | electrical check |
An electric checked right after TM2 was moved from ITW. |
Attachment 1: TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
|
|
2492
|
Wednesday, October 04, 2023, 10:41 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#66 | electrical check/leak check |
TM2 with new target Ta#66 had an electrical check and leak check on SHC. |
Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
|
|
2498
|
Tuesday, November 07, 2023, 13:42 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check with the spent target |
TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. |
Attachment 1: TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
|
|
2500
|
Wednesday, November 08, 2023, 12:14 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | UCx#43 | electrical check/leak check |
TM4 with new target UCx#43 was electrical and leak checked on SHC. |
Attachment 1: TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
|
|
2503
|
Monday, November 20, 2023, 12:28 |
Eric Lahe | South Hot-Cell | Maintenance | | | Light Bulb Replacement - South Hot Cell roof lights |
3 light bulbs replaced in the ISAC South Hot Cell - North West light, South west light, and South East light bulbs. Northeast light currently still working.
The South East light is not working after bulb replacement. This bulb was tested using the wires from the Northeast light station and the bulb is working properly. Electrical services is being contacted to troubleshoot the cable issues. |
2506
|
Monday, November 27, 2023, 12:01 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator tong cable and wrist replacement |
Broken tong cable on SW manipulator (serial #8106) of SHC was replaced today.
Following ISAC Hot Cell entry procedure, Document 157554, SHC was entered and wrist and tong cable were replaced with a pre-run/assembled wrist, cable and tong. It is standard to try and pre-make/load a new cable into a spare tong assembly to reduce time spent in the HC. This marks the first time a wrist has been replaced. Rationale for replacing the wrist at this time is that internal spacer A-14118 which the ting cable rides over has had grooves worn into it. This is a result of regular wear and tear but could be causing premature wear on the tong cable. Replacement is a preventative measure. This is the original wrist and spacer from the original install in 1998. The wrist that was removed will be rebuilt and swapped out with the original one on the SE manipulator (serial #7986) at a later date.
Parts replaced today are: New - Bottom half of wrist joint (CRL-13950), New - Tong cable (CRL-14230) and used tong assembly (CRL-18062)
Procedure took about 40 minutes. Dose received was ~0.046 uSv |
2507
|
Tuesday, November 28, 2023, 12:58 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - Silo to SHC |
TM3 was moved from the Silo to South Hot Cell. |
2509
|
Wednesday, December 13, 2023, 11:42 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - TCS TO SHC |
TM3 has been moved from the target conditioning station to the south hot cell. |
2516
|
Monday, January 08, 2024, 14:47 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - ITW to SHC |
TM2 was moved from ITW to the South Hot Cell with Ta#66 target. |
2517
|
Tuesday, January 09, 2024, 16:10 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 Move - SHC to Silo |
TM2 was moved with no target attached from the South Hot Cell to a silo. |
2522
|
Friday, January 12, 2024, 10:53 |
David Wang | South Hot-Cell | Standard Operation | | | ITW entrance module has been moved from ITW to SHC. |
ITW entrance module has been moved from ITW to SHC. The move is smooth. I cleaned entrance module tank flange and o r-ing slot. entrance module tank flange o ring is replaced . |
2523
|
Friday, January 12, 2024, 11:25 |
David Wang | South Hot-Cell | Standard Operation | TM2 | Ta#66 | Ta#66 post operation electrical check at SHC |
Ta#66 post operation electrical check was done at SHC this Monday. See attachment. |
Attachment 1: TM2_Ta66_post__oeration_electrical_check.pdf
|
|
2524
|
Wednesday, January 17, 2024, 20:09 |
Carla Babcock | South Hot-Cell | Standard Operation | | Ta#66 | Ta#66 post irradiation inspection |
On Jan. 9 we did the PIE on Ta#66. Opened the heat shield and removed the EE. The inside of the heat shield was very black with lots of flakes falling off. The target itself looked overheated, and the container looked pretty bad for a Ta target. The outside of the EE looked perfect but after removing it there was a lot of black stuff on the side and we saw that the Re foil was curled up. Jens said during the runtime that he saw something that looked like a wire in the beam path, so maybe this was it. |
Attachment 1: 20240109_100926(1).jpg
|
|
Attachment 2: 20240109_101053.jpg
|
|
Attachment 3: 20240109_102409.jpg
|
|
2529
|
Wednesday, January 24, 2024, 08:34 |
chad fisher | South Hot-Cell | Repair | TM4 | UCx#43 | Plating and coating from UCx#43 failure |
TM4 has seen significant coating of the main standoff insulators and various other components stemming from failure in UCx#43 target. See attached pictures showing coating on containment box, support frame, main standoff insulators, standoff insulators high voltage shield etc. Note tracking marks on main standoff insulators.
Wednesday, January 24, 2024, 12:54 Carla's edit:
Meggered all HV components relative to HV common and HV common relative to ground. Nothing out of the ordinary, HV common to gnd was 700MOhms at 1kV. Seems whatever got onto the insulators is non-conductive, or is not as bad as it seems. |
Attachment 1: IMG_2464.jpg
|
|
Attachment 2: IMG_2465.jpg
|
|
Attachment 3: IMG_2470.jpg
|
|
Attachment 4: IMG_2471.jpg
|
|
Attachment 5: IMG_2472.jpg
|
|
2533
|
Friday, January 26, 2024, 08:30 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | window line VCR leak check after containment box removal/installation. |
Chad and I did window line VCRs leak check after containment box removal/installation. The first pair of VCRs have leak. Chad changed VCRs. Both VCr fittings on window lines are completely leak free to 0.0 XE-9 atm.cc/sec now. |
2536
|
Friday, January 26, 2024, 16:48 |
Carla Babcock | South Hot-Cell | Standard Operation | TM4 | UC43 | UCx#43 PIE |
UCx#43 PIE was done in the SHC. As expected based on electrical measurements, the target container was broken on the right side and came off easily. Despite all the black stuff seen on the containment box and source tray, the inside of the heat shield was very clean. Checked if the Re foil was curled in and didn't see anything. Looked fine other than the broken container. |
2551
|
Friday, March 15, 2024, 10:04 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move - SHC to NE Silo |
TM3 was moved from SHC to NE silo. Cable tray was recently installed. |