Entry  Friday, October 07, 2022, 14:46, Adam Newsome, South Hot-Cell, Development, , , Addition of lift table to E-stop circuit ISAC_SHC_Lift_Schematic_updated_20221007.jpgPXL_20221007_185635660.MP.jpgPXL_20221007_185649720.jpg
A modification was made to integrate the hot cell's lift table into the E-stop circuit. See work permit I2022-10-07-1
The E-stop mounted on the right side of the small enclosure adjacent to the operator station will now serve to stop the lift table's up and down
motion, as well as the turntables up/down and CW/CCW motions. Functionality was checked by B. Webster (electrical services) and A. Newsome.
Entry  Tuesday, January 24, 2023, 14:22, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#41, TM4 electrical check with and without target at SHC TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf
TM4 electrical check with UCX41target and without target at SHC.  The results are good. See attachment.
Entry  Friday, May 19, 2023, 09:39, Frank Song, South Hot-Cell, Standard Operation, TM2, TiC#6, leak/electrical check TM2_with_TiC#6_leak_and_eletrical_check.png
 TM2 with TiC#6 was checked on SHC, see pic attached pls.
Entry  Tuesday, October 03, 2023, 14:28, Frank Song, South Hot-Cell, Standard Operation, TM2, Nb#11, electrical check TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
 An electric checked right after TM2 was moved from ITW. 
Entry  Wednesday, October 04, 2023, 10:41, Frank Song, South Hot-Cell, Standard Operation, TM2, Ta#66, electrical check/leak check TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf
 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 
Entry  Tuesday, November 07, 2023, 13:42, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#65, electrical check with the spent target TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
TM4 with spent target Ta#65 was electrical checked right after being moved to SHC. 
Entry  Wednesday, November 08, 2023, 12:14, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#43, electrical check/leak check TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf
 TM4 with new target UCx#43 was electrical and leak checked on SHC.
Entry  Monday, November 20, 2023, 12:28, Eric Lahe, South Hot-Cell, Maintenance, , , Light Bulb Replacement - South Hot Cell roof lights 
 3 light bulbs replaced in the ISAC South Hot Cell - North West light, South west light, and South East light bulbs. Northeast light currently still
working.
 
Entry  Monday, November 27, 2023, 12:01, chad fisher, South Hot-Cell, Maintenance, , , Manipulator tong cable and wrist replacement 
Broken tong cable on SW manipulator (serial #8106) of SHC was replaced today. 
Following ISAC Hot Cell entry procedure, Document 157554, SHC was entered and wrist and tong cable were replaced with a pre-run/assembled wrist,
cable and tong. It is standard to try and pre-make/load a new cable into a spare tong assembly to reduce time spent in the HC. This marks the first time
Entry  Tuesday, November 28, 2023, 12:58, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - Silo to SHC 
TM3 was moved from the Silo to South Hot Cell. 
Entry  Wednesday, December 13, 2023, 11:42, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - TCS TO SHC 
TM3 has been moved from the target conditioning station to the south hot cell. 
Entry  Monday, January 08, 2024, 14:47, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - ITW to SHC 
TM2 was moved from ITW to the South Hot Cell with Ta#66 target. 
Entry  Tuesday, January 09, 2024, 16:10, Adam Newsome, South Hot-Cell, Standard Operation, TM2, , TM2 Move - SHC to Silo 
TM2 was moved with no target attached from the South Hot Cell to a silo. 
Entry  Friday, January 12, 2024, 10:53, David Wang, South Hot-Cell, Standard Operation, , , ITW entrance module has been moved from ITW to SHC.  
ITW entrance module has been moved from ITW to SHC. The move is smooth.  I cleaned entrance module tank flange and o r-ing slot.  entrance
module tank flange o ring  is replaced . 
Entry  Friday, January 12, 2024, 11:25, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#66, Ta#66 post operation electrical check at SHC TM2_Ta66_post__oeration_electrical_check.pdf
Ta#66 post operation electrical check was done at SHC this Monday. See attachment. 
Entry  Wednesday, January 17, 2024, 20:09, Carla Babcock, South Hot-Cell, Standard Operation, , Ta#66, Ta#66 post irradiation inspection 20240109_100926(1).jpg20240109_101053.jpg20240109_102409.jpg
On Jan. 9 we did the PIE on Ta#66. Opened the heat shield and removed the EE. The inside of the heat shield was very black with lots of flakes falling
off. The target itself looked overheated, and the container looked pretty bad for a Ta target. The outside of the EE looked perfect but after removing
it there was a lot of black stuff on the side and we saw that the Re foil was curled up. Jens said during the runtime that he saw something that looked
Entry  Wednesday, January 24, 2024, 08:34, chad fisher, South Hot-Cell, Repair, TM4, UCx#43, Plating and coating from UCx#43 failure IMG_2464.jpgIMG_2465.jpgIMG_2470.jpgIMG_2471.jpgIMG_2472.jpg
TM4 has seen significant coating of the main standoff insulators and various other components stemming from failure in UCx#43 target. See attached pictures
showing coating on containment box, support frame, main standoff insulators, standoff insulators high voltage shield etc. Note tracking marks on main standoff
insulators.
Entry  Friday, January 26, 2024, 08:30, David Wang, South Hot-Cell, Standard Operation, TM4, , window line VCR leak check after containment box removal/installation.  
Chad and I did window line VCRs leak check after containment box removal/installation.  The first  pair of  VCRs have leak. Chad changed
VCRs. Both VCr fittings on window lines are completely leak free to 0.0 XE-9 atm.cc/sec now. 
Entry  Friday, January 26, 2024, 16:48, Carla Babcock, South Hot-Cell, Standard Operation, TM4, UC43, UCx#43 PIE 
UCx#43 PIE was done in the SHC. As expected based on electrical measurements, the target container was broken on the right side and came off easily.
Despite all the black stuff seen on the containment box and source tray, the inside of the heat shield was very clean. Checked if the Re foil was curled
in and didn't see anything. Looked fine other than the broken container.
Entry  Friday, March 15, 2024, 10:04, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - SHC to NE Silo 
TM3 was moved from SHC to NE silo. Cable tray was recently installed. 