192
|
Tuesday, October 09, 2012, 10:35 |
David Wang | ITE | Standard Operation | TM4 | NiO #1 | Disconnected TM4 in ITE. | I disconnected TM4 in ITE this morning.
The heat shield circuit has been purged with
air. |
|
193
|
Tuesday, October 09, 2012, 11:17 |
Bevan Moss | ITE | Standard Operation | TM4 | NiO#1 | Module Move | TM4 with NiO#1 was moved from ITE
to the SHC today. The move went well with
no issues. |
|
194
|
Tuesday, October 09, 2012, 13:44 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | NiO#1 removal UCx#5 installation | NiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and |
|
195
|
Tuesday, October 09, 2012, 14:53 |
Bevan Moss | Conditioning Station | Development | TM4 | UCx#5 | Module Move | TM4 was remote moved from the SCH to the
TCS today. This was the first time the module
was moved with the framework for the cage |
|
196
|
Tuesday, October 16, 2012, 07:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCX#5 | TM4 heat shield helium pressure test and electrical check at CS | TM4 heat shield helium pressure test and
electrical check were done at CS
last week. The results are good. NO leak |
|
197
|
Wednesday, October 24, 2012, 11:51 |
Travis Cave | ITE | Standard Operation | TM4 | UCx#5 | module moved | Yesterday TM#4 with UCx#5 was moved to
the east target station from the conditioning
station, move went well. |
|
199
|
Wednesday, October 31, 2012, 11:24 |
David Wang | ITE | Standard Operation | TM4 | | Transfer five shielding blocks from ITW to ITE. | Bevan and I transferred five shielding
blocks from ITW to ITE. ITE is ready for
taking proton beam. |
|
215
|
Wednesday, November 14, 2012, 11:04 |
David Wang | ITE | Repair | TM4 | | Change ITE dump water circiut flow wheel | I changed ITE dump water circuit flow wheel
due to its poor performance. The new flow
wheel works fine. The signal on electrical |
|
218
|
Monday, December 03, 2012, 19:34 |
Grant Minor | ITE | Standard Operation | TM4 | LpUCx | Argon supply opened for ITE vent | Around 7pm tonight I opened the main valve
approximately 1.5 turns on the Argon bottle
used for venting ITE, located in the ISAC |
|
219
|
Tuesday, December 04, 2012, 13:27 |
Travis Cave | ITE | Standard Operation | TM4 | UCx#5 | module move & electrical check | TM#4 with UC#5 has been moved from east
target station to the south hot cell move
went well. Also the electrical check |
|
220
|
Tuesday, December 04, 2012, 13:33 |
David Wang | ITE | Standard Operation | TM4 | UCX#5 | Disconnected TM4 in ITE. | I disconnected TM4 in ITE. All water lines
had been purged.Travis was with me . |
|
221
|
Tuesday, December 04, 2012, 14:20 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | UCx#5 Removal | UCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail |
|
222
|
Wednesday, December 05, 2012, 13:26 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | N/A | TM4 moved from SHC to South West Silo | TM4 was successfully moved from the South
Hot Cell to the South-West Silo remotely
by Grant Minor, with help from David Wang |
|
234
|
Thursday, January 17, 2013, 11:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | | module move | TM#4 has been moved from the SW silo to
the south hot cell, move went well. |
|
235
|
Friday, January 18, 2013, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | CS Test Target #1 | Electrical check | Electrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details. |
|
236
|
Friday, January 18, 2013, 11:15 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with the test target #1 is now in
the conditioning station, move went well. |
|
237
|
Friday, January 18, 2013, 11:17 |
David Wang | South Hot-Cell | Standard Operation | TM4 | dummy target | TM4 heat shield circuit leak check with dummy target on. | Chad and i did a leak check on TM4 heat
shield circuit with installed dummy target
at SHC today. The leak detector is pumped |
|
238
|
Friday, January 18, 2013, 16:56 |
Grant Minor | Conditioning Station | Standard Operation | TM4 | | VAT valve btwn roughing and nuc. vent. closed | Bevan attempted to start pumping down on
TM4 today remotely but there was an issue.
He will report on Monday. |
|
239
|
Friday, January 18, 2013, 17:01 |
Grant Minor | Conditioning Station | Development | TM4 | | Photos of the CS with TM4 (after the no-module HV test, only vacuum connected) | Attached are some photos of TM4 in the
Conditioning Station after the no-module
HV test completion. Only vacuum services |
|
242
|
Wednesday, February 06, 2013, 14:34 |
Bevan Moss | Conditioning Station | Development | TM4 | CS Test Target #1 | 40kV All Common w/o Water Test | Today the module was biased to 40kV
in the conditioning station. The current
draw was 0uA. Sparking started at 27 kV. |
|