Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 219     Entry time: Tuesday, December 04, 2012, 13:27
Author: Travis Cave 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#5 
Subject: module move & electrical check 

TM#4 with UC#5 has been moved from east target station to the south hot cell move went well.  Also the electrical check post beam was done on the module see attached pdf for the results.

Attachment 1: UC#5_SIS_Post_beam.PDF  185 kB  | Show | Hide all
ELOG V2.9.2-2455