Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
192
Entry time:
Tuesday, October 09, 2012, 10:35
Author:
David Wang
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
NiO #1
Subject:
Disconnected TM4 in ITE.
I disconnected TM4 in ITE this morning. The heat shield circuit has been purged with air.
ELOG V2.9.2-2455