Message ID: 238     Entry time: Friday, January 18, 2013, 16:56
Author: Grant Minor 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: VAT valve btwn roughing and nuc. vent. closed 

Bevan attempted to start pumping down on TM4 today remotely but there was an issue.  He will report on Monday.

I went into the Target Hall this afternoon while on the phone with Bevan and performed the following:

- Checked the knurled vent valves on the side of each turbo, both were found to be in the tightened position (all the way clockwise)

- Closed the VAT valve between the scroll pump and the nuclear ventilation