  1057   Tuesday, September 01, 2015, 10:32 Travis CaveITWStandard OperationTM2ZrC #7Module movedTM#2 with ZrC#7 has been moved from the
conditioning station  to the west target
station.
  
  1059   Tuesday, September 01, 2015, 14:54 David WangITWStandard OperationTM2 TM2 has been connectec in ITW.TM2 has been connected in ITW. During the
connection, Anders and I  found the
TM2  high current cables used in ITE
  
  1060   Tuesday, September 01, 2015, 16:03 Grant MinorITWStandard OperationTM2ZrC #7Photos of TM2 Connection Procedure on Docushare 1Sept2015https://documents.triumf.ca/docushare/dsweb/View/Collection-15323   
  1062   Wednesday, September 02, 2015, 09:26 David WangITEStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015I attach new Target Hall schedules here
for 2015 fall and winter runs (beam schedule
129). The TH excel sheet schedule for beam
 Target_Hall_shedule_129_Sep_to_Dec.xlsxTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1063   Tuesday, September 08, 2015, 10:11 David WangITWStandard OperationTM2ZrC5 Shielding blocks have been transferred from ITE to ITW.Maico and Dan moved 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam.
  
  1064   Wednesday, September 09, 2015, 09:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south west
silo to the south hot cell.
  
  1070   Thursday, September 17, 2015, 09:01 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south hot
cell to the north east silo.
  
  1072   Tuesday, September 22, 2015, 11:12 Travis CaveITEStandard OperationTM4UC#13Module movedTM#4 with UC#13 has been moved from the
east target station to the south hot cell.
  
  1073   Tuesday, September 22, 2015, 11:35 Travis CaveSouth Hot-CellStandard OperationTM4UC#13Electrical CheckTM#4 with UC#13 post beam electrical check.
Also and electrical check was done without
the target on.
 TM4elecchkUC13postbeamSHC.PDFTM4_elecchk_totgt_with_IGLISline.PDF 
  1074   Tuesday, September 22, 2015, 11:39 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check with Ta#46 attached.  TM4Ta46elecchkSHC.PDF 
  1075   Tuesday, September 22, 2015, 13:15 David WangSouth Hot-CellStandard Operation Ta#46Leak check on TM4 HS water line with new Ta#46 target. at SHCChad and I leak checked the HS line at
SHC. No leak. Leak rate 0.0xE-9atm.cc/sec.
  
  1076   Wednesday, September 23, 2015, 08:38 Travis CaveConditioning StationStandard OperationTM4Ta#46Module movedTM#4 with Ta#46 has been moved from the
south hot cell to the conditioning station.
  
  1077   Wednesday, September 23, 2015, 13:56 Travis CaveConditioning StationStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check at the conditioning
station with Ta#46 target.
 TM4Ta46elecchkCS.PDF 
  1078   Wednesday, September 23, 2015, 14:32 David WangConditioning StationStandard OperationTM4Ta#45Helium pressure test on TM4 HS line at CSHelium pressure test HS line at CS with
70 psi for 2 minutes. Base  leak rate
0.0xE-9atm.cc/sec. No response. The line
  
  1079   Wednesday, September 23, 2015, 14:35 David WangConditioning StationStandard OperationTM4Ta#46TM4 has been connected at CSTM4 has been connected at CS. Turbo- pumps
and water system are started and running
. The HV cover has been installed on the
  
  1081   Thursday, September 24, 2015, 14:59 Friedhelm AmesConditioning StationStandard OperationTM4Ta#46start high voltage conditioning    
  1082   Friday, September 25, 2015, 07:56 David WangConditioning StationStandard Operation  Target Hall schedule from Sep 08th 2015 to Dec 25th 2015weekly update see attachment  Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp 
  1083   Friday, September 25, 2015, 08:21 Travis CaveSouth Hot-CellStandard Operation UC#13Spent Target moveThe spent UC#13 target has been moved from
the south hot cell to the ISAC spent target
vault. It was placed pail #128 and in tray
 Vault_Storage_September_24_2015.pdf 
  1084   Monday, September 28, 2015, 10:10 David WangConditioning StationStandard OperationTM4Ta#46Switched off CS vacuum pumps and water systemI switched off CS vacuum pumps and water
system after Isac opps finished the TM4 conditioning
at CS.
  
  1085   Tuesday, September 29, 2015, 09:38 Travis CaveITEStandard OperationTM4Ta#46Module movedTM#4 with Ta#46 has been moved to ITE from
the conditioning station.
  