Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1083     Entry time: Friday, September 25, 2015, 08:21
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number: UC#13 
Subject: Spent Target move 

The spent UC#13 target has been moved from the south hot cell to the ISAC spent target vault. It was placed pail #128 and in tray spot 1A. It was 21.5mSv/hr upon removal from the hot cell. See attached PDF for details.

Attachment 1: Vault_Storage_September_24_2015.pdf  53 kB  | Show | Hide all
ELOG V2.9.2-2455