ID Date Author Category Typedown Module Target/Number Subject Text Attachments
  1025   Wednesday, July 29, 2015, 08:59 Travis CaveITEStandard OperationTM4UC#13Module movedTM#4 with UC#13 has been moved from the
conditioning station to the east target station.
  
  1026   Wednesday, July 29, 2015, 10:14 David WangITEStandard OperationTM4 TM4 has been connected in ITEDan and I connected TM4 in ITE. We checked
all water signals on ITE cooling circuits.
Everything is good.
  
  1027   Thursday, July 30, 2015, 14:05 Travis CaveSpent Target VaultStandard Operation SiC#31Spent target movedSiC#31 has been moved to the spent target
vault. It is in pail #127 and placed in spot
3C of the vault is was 489mSv/hr when removed
 Vault_Storage_July_30_2015.pdf 
  1028   Friday, July 31, 2015, 09:47 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 019 2015Weekly update of Target Hall schedule after
so many jobs have been finished in this week. 
See attachment 1, 2
 Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mpp 
  1029   Thursday, August 06, 2015, 10:26 Travis CaveSpent Target VaultStandard Operation  Spent Target Measurments and AssaysAll targets but one ( SiC#31 went in last
week) have been measured or assayed. See
attached PDF for the details.
 Vault_Storage_August_6_2015.pdf 
  1030   Thursday, August 06, 2015, 11:40 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 is now in the south hot cell   
  1031   Friday, August 07, 2015, 10:01 David WangITEStandard Operation  Target Hall Scheduled Activities April 07 - August 19 2015Weekly update target hall schedule and
activities. See attachment 1,2
Update and extend Target Hall schedule
 Target_Hall_Scheduled_Activities__Apr_07_to_Aug_19.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_19.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf 
  1034   Thursday, August 13, 2015, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetElectrical CheckElectrical check of TM2 without target
after that widget has installed, electrical
check with the shunts on, electrical check
 TM2_elechknotgtafterwidget.PDFTM2_elechknotgtshunt.PDFTM2_elecchkdummytgt.PDF 
  1036   Thursday, August 13, 2015, 14:36 Travis CaveConditioning StationStandard OperationTM2Dummy TargetModule movedTM#2 with the dummy target has been moved
to the conditioning station.
  
  1042   Thursday, August 20, 2015, 10:15 Travis CaveSouth Hot-CellStandard OperationTM2Dummy TargetModule movedTM#2 is now in the south hot cell.   
  1043   Thursday, August 20, 2015, 11:00 Travis CaveConditioning StationStandard OperationTM2Dummy TargetElectrical CheckTM#2 electrical check at the conditioning
station. All pumps were off but the module
was not vented.
 TM2_elecchkdummytgtatCS.PDF 
  1044   Thursday, August 20, 2015, 13:48 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - Sep 08 2015 Weekly update target hall schedule.See
attachment 1,2
Spring and summer run is close to
 Target_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Sep_08.pdf 
  1047   Wednesday, August 26, 2015, 09:20 Travis CaveSouth Hot-CellStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 with ZrC #7 installed  TM2_elec_chk_ZrC7_SHC.PDF 
  1050   Wednesday, August 26, 2015, 11:12 Travis CaveConditioning StationStandard OperationTM2ZrC #7Module movedTM#2 with ZrC#7 has been moved to the conditioning
station from the south hot cell.
  
  1051   Wednesday, August 26, 2015, 14:28 David WangConditioning StationStandard OperationTM2ZrCLeak check on TM2 HS and windowwater line with new ZrC target at SHCChad and I leak checked TM2 HS and window
circuit VCR joints with ZrC target and containment
box installed at SHC. No leak has been found.
  
  1052   Wednesday, August 26, 2015, 14:30 David WangConditioning StationStandard OperationTM2ZrCTM2 and Cs vacuum sysyem has been connected at CS.Turbo-pumps are started . The pumping down
is good so far.
  
  1053   Wednesday, August 26, 2015, 14:52 David WangConditioning StationStandard OperationTM2ZrCHelium pressure test on TM2 HS and window lines at CSLD base LR 0.0xE-9 atm.cc/sec , 80 psi
helium 2 minutes on HS and window circuits.
No leak. Also, the reinstalled(after rewiring
  
  1054   Thursday, August 27, 2015, 08:43 Travis CaveConditioning StationStandard OperationTM2ZrC #7Electrical CheckElectrical check of TM#2 at the conditioning
station under vacuum. The resistance value
of the target to 60kV common is a bit lower
 TM2_elec_chk_ZrC7_CS.PDF 
  1055   Thursday, August 27, 2015, 10:10 Anders MjosConditioning StationStandard OperationTM2ZrC#7Conditioning new Source TrayThursday, August 27, 2015, 10:10: Started
water system. TK2 level reduced from 24.9
to 23.5 in. 
 2015-08-31_Service_Cap_Sparking_on_Rubber_Plug.pdfTM2_Source_Tray_with_ZrC#7.docxVacuum_gague_calibration.xlsx 
  1056   Tuesday, September 01, 2015, 06:25 David WangConditioning StationStandard OperationTM2ZrCArgon venting TM2 at CSArgon venting TM2 at CS.   