Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1078     Entry time: Wednesday, September 23, 2015, 14:32
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#45 
Subject: Helium pressure test on TM4 HS line at CS 

Helium pressure test HS line at CS with 70 psi for 2 minutes. Base  leak rate 0.0xE-9atm.cc/sec. No response. The line is leak tight.

ELOG V2.9.2-2455