Message ID: 1059     Entry time: Tuesday, September 01, 2015, 14:54
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: TM2 has been connectec in ITW. 

TM2 has been connected in ITW. During the connection, Anders and I  found the TM2  high current cables used in ITE and CS are short in ITW.  Anders and Grant found the original TM2 ITE high current cables in target hall. We replaced them. They works fine. But, a little bit longer on cable length would be easy to connect them. All other connections and HV cover in ITW work for the TM2 so far.