Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1084     Entry time: Monday, September 28, 2015, 10:10
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#46 
Subject: Switched off CS vacuum pumps and water system 

I switched off CS vacuum pumps and water system after Isac opps finished the TM4 conditioning at CS.

ELOG V2.9.2-2455