  930   Wednesday, June 03, 2015, 11:22 David WangConditioning StationStandard Operation  Target Hall Scheduled Activities April 07 - July 21 2015I revised the Target Hall schedule to July
21 2015. It is the time new TM2 with ZrC
target started at ITW.
 Target_Hall_Scheduled_Activities__Apr_07_to_July_21__2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mpp 
  931   Wednesday, June 03, 2015, 13:01 Anders MjosConditioning StationStandard OperationTM4SiC#31Conditioning SiC#31PNG1 connected to PNG in service cap
(as per David W)
 Wednesday, June 03, 2015, 12:59:
 SiC#31_Conditioning.docx 
  932   Wednesday, June 03, 2015, 13:51 David WangConditioning StationStandard OperationTM4SiC #31TM4 is connected at CSTM4 has been connected at CS. CS HV cover
is installed.I made a pair of new cooling
lines for TM window cooling at CS. The TM4
 007.JPG009.JPG008.JPG010.JPG 
  938   Wednesday, June 10, 2015, 10:02 Travis CaveITEStandard OperationTM4SiC#31Module movedTM#4 has been moved from the conditioning
station to the east target station.
  
  939   Wednesday, June 10, 2015, 11:49 David WangITEStandard OperationTM4SiC #31TM4 has been connected in ITEDan and I connected TM4 in ITE. At this
stage, water is supplied to TM4 only. We
checked the TM4 water signals from electrical
  
  940   Wednesday, June 10, 2015, 13:17 David WangITEStandard OperationTM1 Target Hall Scheduled Activities April 07 - July 26 2015Weekly update the schedule after some jobs
have been finished in this week.
 Target_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mpp 
  945   Friday, June 12, 2015, 13:27 David WangSouth Hot-CellStandard Operation  TM2 new source tray has been remotely transferred from TH into SHC successfully.TM2 new source tray has been remotely transferred
into SHC successfully. The transfer table
has been moved back to TH within 1 hour. 
  
  946   Monday, June 15, 2015, 09:42 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 is now in the south hot cell.   
  948   Monday, June 15, 2015, 14:14 David WangSouth Hot-CellStandard Operation  Target Hall Scheduled Activities April 07 - July 21 2015Weekly update Target Hall schedule 2015-06-15.
See attachment 1,2
 2015-06-19, Update the schedule
 Target_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_21_2015.pdf 
  954   Friday, June 19, 2015, 11:52 David WangITEStandard OperationTM4SiC #315 Shielding blocks have been transferred from ITW to ITE.5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  962   Friday, June 26, 2015, 08:27 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - July 24 2015Update the Target hall Schedule after some
changes on TM2 refurbishment. See attachment
1,2
 Target_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mpp 
  965   Friday, June 26, 2015, 14:33 David WangConditioning StationStandard OperationTM2 TM2 have been moved from SHC to CSBill and I mover TM2 from SHC to CS. The
move is smooth. I connected the CS vacuum
system after the move, and started the roughing.
  
  969   Tuesday, June 30, 2015, 11:27 Travis CaveITWStandard OperationTM1UC#12Module movedTM#1 with UC#12 has been moved from the
west station to the south hot cell.
  
  970   Tuesday, June 30, 2015, 12:37 chad fisherSouth Hot-CellStandard OperationTM1UCx#12UCx #12 RemovalUCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly
  
  971   Tuesday, June 30, 2015, 15:41 David WangITWStandard OperationTM1 TM1 was disconnected in ITW this morning.TM1 was disconnected in ITW  this
morning. The ITW was vented with argon last
night.
  
  974   Thursday, July 02, 2015, 11:49 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule movedTM#1 has been moved from the south hot
cell to the south west silo.
  
  975   Thursday, July 02, 2015, 11:51 Travis CaveSpent Target VaultStandard Operation UC#12Spent target movedUC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a
 Vault_Storage_July_2_2015.pdf 
  976   Friday, July 03, 2015, 09:11 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 has been moved from the conditioning
station to the south hot cell.
  
  978   Friday, July 03, 2015, 09:41 David WangConditioning StationStandard OperationTM2 Target Hall Scheduled Activities April 07 - July 24 2015Updated the schedule before the weekend
2015-07-03. See attachment 1,2
Updated the schedule according to
 Target_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_July_24_2015.mppTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.pdfTarget_Hall_Scheduled_Activities__Apr_07_to_Aug_07.mpp 
  987   Thursday, July 09, 2015, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule movedTM#2 has been moved from the south hot
to the north east silo. TM#1 has been moved
from the south west silo to the conditioning
  