Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 921     Entry time: Monday, June 01, 2015, 11:23
Author: Travis Cave 
Category: ITE 
Type: Standard Operation 
Module: TM4 
Target/Number: Ta#45 
Subject: Module moved 

TM#4 with Ta#45 has been moved from the east target station to the south hot cell.

ELOG V2.9.2-2455