Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 927     Entry time: Tuesday, June 02, 2015, 14:32
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: SiC #31 
Subject: Leak check on TM4 HS water line with new SiC #31 target. at SHC 

Chad and I leak checked TM4 HS water line with SiC #31 target installed. leak rate:0.0xE-9atm.cc/sec.  No leak.  The line will be helium pressurized at CS later.

2015-06-03, helium pressure test the line at CS. 70psi 3 minutes. leak rate 0.0xE-9 atm.cc/sec. No leak.   See attachments

Attachment 1: 003.JPG  2.437 MB  Uploaded Wednesday, June 03, 2015, 12:02  | Show | Hide all
Attachment 2: 005.JPG  2.505 MB  Uploaded Wednesday, June 03, 2015, 12:02  | Show | Hide all
Attachment 3: 001.JPG  2.542 MB  Uploaded Wednesday, June 03, 2015, 12:02  | Show | Hide all
ELOG V2.9.2-2455