265
|
Thursday, March 14, 2013, 11:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbos Started | Turbos started at 11:14. TP1S achieved
full speed in less than 2 minutes. TP1 and
2 tripped at 9 minutes. Restarted and reached |
 |
540
|
Tuesday, November 12, 2013, 14:31 |
Bevan Moss | Conditioning Station | Standard Operation | TM2 | | Turbo pumps started | The turbo pumps have been started
on TM2 and the conditioning station. |
|
2417
|
Tuesday, February 14, 2023, 11:36 |
David Wang | Assembly/Bench Test | Repair | | | Turbo pump BVs o-ring replacement. | Five of used internal leaked
TP BVs are serviced and repaired. Internal
plunge o-ring and case o-ring are replaced |
|
270
|
Tuesday, March 19, 2013, 09:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Turbo pump 1 replaced roughing started | David replaced the broken turbo pump
this morning and I have started roughing
at 9:54. |
|
360
|
Thursday, May 23, 2013, 14:08 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Turbo Pumps on | The turbo pumps have been turned
on and are running |
|
513
|
Friday, October 18, 2013, 15:55 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Turbo Pumps are on | The Turbo pumps are now running on
TCS |
|
308
|
Friday, April 19, 2013, 13:32 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Turbo Pumps Started | Both Turbo Pumps are now operational. |
|
309
|
Friday, April 19, 2013, 15:25 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Turbo Pumps Started |
|
|
340
|
Friday, May 10, 2013, 14:05 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Turbo Pumps On | The turbo pumps are on. TP1 and TP2 once
again timed out and had to be restarted before
they would stay on. |
|
304
|
Wednesday, April 17, 2013, 15:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Turbo Pumps Failed | Both Turbo pumps on TM3 have failed.
They were both attempted to start in soft
mode. TP2 could only achieve ~19kpm and TP1 |
|
305
|
Friday, April 19, 2013, 10:48 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Turbo Pump 2 replaced | Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit. |
|
306
|
Friday, April 19, 2013, 10:48 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Turbo Pump 2 replaced | Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit. |
|
39
|
Tuesday, October 25, 2011, 16:57 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | | Turbo Pump 1 issues | Roughing on TM1 started at ~15:00 today
by ~16:30 the module had reached a pressure
of ~200 mTorr and the turbo pumps were turned |
|
267
|
Monday, March 18, 2013, 12:03 |
Bevan Moss | Conditioning Station | Repair | TM4 | CS Test Target #1 | Turbo Pump 1 Failure and Venting | Over the weekend Turbo pump one failed.
It was attempted to restart the turbo in
soft start but that also failed. Although |
|
271
|
Tuesday, March 19, 2013, 13:49 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | Tubros Started | Turbo Pumps have been started and
are in normal operation. TP1 which has recently
been replaced was started in soft start and |
|
41
|
Friday, October 28, 2011, 09:30 |
chad fisher | South Hot-Cell | Repair | TM4 | | Tube Heater + Leak Check C.B. | Base Pressure: 0.0x10-4
Stable Leak Rate: 0.0x10-9
Leak check of tube heater circuit, |
|
1675
|
Thursday, January 04, 2018, 13:28 |
Anders Mjos | Conditioning Station | Maintenance | | | Troubleshooting IG1S | TCS:IG1S is reporting vacuum levels that
seem to be too low (1E-10 to 1E-8 Torr).
The gauge was connected to the controller |
|
1896
|
Thursday, March 21, 2019, 09:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | Tray insertion | This morning new water block fasteners
and gas line capture nut fasteners were inserted
into the hot cell. Window waterline blank |
 |
1883
|
Tuesday, March 05, 2019, 14:29 |
chad fisher | South Hot-Cell | Repair | | | Tray Transfer Fixture Repair Complete | Repair of the tray transfer fixture is
complete (minus testing).
A distorted ball nut lock plate was |
   |
2754
|
Monday, January 27, 2025, 08:27 |
om David Wang | South Hot-Cell | Maintenance | | parasite target | Transfer parasite target from SHC to NHC. | A parasite target has been transferred
from SHC to NHC. It is a job to reduce SHC
field for coming SHC entry job. The transfer |
|