Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 340     Entry time: Friday, May 10, 2013, 14:05
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number: No Source Tray 
Subject: Turbo Pumps On 

The turbo pumps are on. TP1 and TP2 once again timed out and had to be restarted before they would stay on.

ELOG V2.9.2-2455