ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
464
|
Wednesday, September 25, 2013, 10:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | module move | TM#3 with NiO#2 has been moved from the
south hot cell to the conditioning station. |
|
465
|
Wednesday, September 25, 2013, 11:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check | The module was checked electrically this
morning before the module move. See the attached
PDF for details. |
|
468
|
Thursday, September 26, 2013, 14:31 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 | September 24
After the manipulator repair
Maico installed the NiO#2 onto the target |
|
470
|
Thursday, September 26, 2013, 14:42 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 |
|
|
477
|
Monday, September 30, 2013, 12:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check | Results of the various electrical checks
done on TM#3 while at the hot cell since
the 27th of September. View PDF for the details. |
|
479
|
Monday, September 30, 2013, 15:59 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Module move from SW Silo to SHC | TM4 was move by myself and Grant.
Move went smoothly, no hang ups. |
|
480
|
Monday, September 30, 2013, 16:00 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | NiO#2 | Electrical check |
|
|
483
|
Tuesday, October 01, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#29 | Electrical check | TM#4 with SiC#29 electrical check post
beam see pdf for details. |
|
486
|
Wednesday, October 02, 2013, 13:44 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Right Coil is leaking | Today Maico and Travis completed
and electrical test to determine the right
and left coil on TM4. The left coil is the |
|
487
|
Wednesday, October 02, 2013, 14:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | Electrical check done on TM#4 with no target,
see PDF. |
|
488
|
Thursday, October 03, 2013, 10:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south hot cell to the south west silo. |
|
498
|
Tuesday, October 08, 2013, 14:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target was to be moved today
but the move was aborted when the crane failed
to move in the East - West direction. The |
|
499
|
Tuesday, October 08, 2013, 14:58 |
Anders Mjos | South Hot-Cell | Standard Operation | | SiC#29 | Target to Heat Shield electrical short | The SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and |
|
504
|
Wednesday, October 16, 2013, 10:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 with no target has been moved from
the south west silo to the south hot cell. |
|
506
|
Thursday, October 17, 2013, 10:24 |
chad fisher | South Hot-Cell | Repair | TM4 | | Coil Line Removal | The containment box was removed from TM4
earlier this morning in preparation for removal
of the C2 circuit water lines, their |
|
509
|
Friday, October 18, 2013, 13:43 |
chad fisher | South Hot-Cell | Repair | TM4 | | C2 Circuit Removal | The C2 circuit (coil 2) water lines and
blocks have been revoed from TM4.
Water block jig could not be used |
|
510
|
Friday, October 18, 2013, 14:33 |
Bevan Moss | South Hot-Cell | Standard Operation | TM4 | | Module move | TM4 without a source tray was moved
from the SHC to the TCS. All went well. |
|
512
|
Friday, October 18, 2013, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check | With the coil line removed an electrical
check was done on TM#4 at the South Hot Cell
see attached pdf. |
|
521
|
Wednesday, October 23, 2013, 09:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | module move | TM#1 with UC #7 has been moved from the
south west silo to the south hot cell. |
|
522
|
Wednesday, October 23, 2013, 12:07 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved back
to the south west silo from the south hot
cell. |
|