Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 461     Entry time: Tuesday, September 24, 2013, 08:15
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: no target 
Subject: Electrical check 

Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance. Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details.

Attachment 1: TM#3_elec_chk_no_target.PDF  133 kB  | Show | Hide all
ELOG V2.9.2-2455