Entry  Monday, September 30, 2013, 12:23, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_SHC2.PDF
    Reply  Monday, September 30, 2013, 16:00, Bevan Moss, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check 
Message ID: 480     Entry time: Monday, September 30, 2013, 16:00     In reply to: 477
Author: Bevan Moss 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: NiO#2 
Subject: Electrical check 

Travis Cave wrote:

Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details.

 There was also a leak check. There was some water remaining in the HS line but once removed the leak cart pumped down to 0.0 x 10-4 Torr and the leak tester was at the bottom limit. There was no response when sprayed with helium