Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Entry  Monday, September 30, 2013, 12:23, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check TM#3_elec_chk_NiO#2_SHC2.PDF
    Reply  Monday, September 30, 2013, 16:00, Bevan Moss, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check 
Message ID: 477     Entry time: Monday, September 30, 2013, 12:23     Reply to this: 480
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM3 
Target/Number: NiO#2 
Subject: Electrical check 

Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details.

Attachment 1: TM#3_elec_chk_NiO#2_SHC2.PDF  502 kB  | Show | Hide all
ELOG V2.9.2-2455