Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
RH-ISAC |
Not logged in |
|
|
Monday, September 30, 2013, 12:23, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check
|
Monday, September 30, 2013, 16:00, Bevan Moss, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check
|
|
Message ID: 477
Entry time: Monday, September 30, 2013, 12:23
Reply to this: 480
|
Author: |
Travis Cave |
Category: |
South Hot-Cell |
Type: |
Standard Operation |
Module: |
TM3 |
Target/Number: |
NiO#2 |
Subject: |
Electrical check |
|
|
Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details. |
|