Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 506     Entry time: Thursday, October 17, 2013, 10:24
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM4 
Target/Number:  
Subject: Coil Line Removal 

The containment box was removed from TM4 earlier this morning in preparation for removal of the C2 circuit water lines, their respective water blocks and conductor block.

Attachment 1: TM4_C2_circuit.pdf  963 kB  | Show | Hide all
ELOG V2.9.2-2455