ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  335   Thursday, May 09, 2013, 14:23 chad fisherSouth Hot-CellRepairTM3 Water Block Jig RemovalThe source tray side of the water block
jig has been removed in preparation for moving
the module to the  conditioning station
 IMG_1059[1].JPG 
  336   Friday, May 10, 2013, 09:26 chad fisherSouth Hot-CellRepairTM3 Containment box reinstalledthe containment box has been reinstalled
onto TM3. After electrical checks it is ready
to move to the conditioning station...for
 IMG_1062[1].JPGIMG_1063[1].JPG 
  337   Friday, May 10, 2013, 11:02 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target and no source tray
has been moved from the south hot cell to
the conditioning station.
  
  338   Friday, May 10, 2013, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkTM#3 electrical check with no target and
no source tray, see pdf.
 TM#3_elec_chk_no_tgt_no_tray.PDF 
  351   Friday, May 17, 2013, 10:04 chad fisherSouth Hot-CellRepair  Manipulator RepairManipulator has been sucessfully repaired.
Recieved 0.19 mSv. Took Approx. 10-20 minutes
  
  355   Wednesday, May 22, 2013, 10:41 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south west silo to the south hot cell.
  
  356   Wednesday, May 22, 2013, 14:11 chad fisherSouth Hot-CellStandard OperationTM4Ta#40Ta#40 installedTa#40 has been installed.
Leak checking and high voltage tomorrow
before the move.
  
  358   Thursday, May 23, 2013, 11:14 David WangSouth Hot-CellStandard OperationTM4TA#40 TM4 TA# 40 HS leak check at SHCTM4 Ta#40 HS leak check is done at SHC
. No leak has been found so far. There will
be  a helium pressure test on it at
  
  364   Monday, May 27, 2013, 11:55 chad fisherSouth Hot-CellStandard Operation  Special Tooling for RFQ targetThe special tool made for the RFQ target
autopsy has been inserted into the hot cell.
 
  
  370   Tuesday, May 28, 2013, 10:42 Travis CaveSouth Hot-CellStandard OperationTM4Ta#40Electrical checkResults of the electrical check on 
TM#4 with Ta#40, it passed. See attached
PDF for results.
 TM#4_Ta#40_SIS_Target_Elec_Chk.PDF 
  372   Wednesday, May 29, 2013, 12:07 chad fisherSouth Hot-CellDevelopment SiC#28 RFQRFQ AutopsyMajor portions of the RFQ target have now
been sucessfully dismantled. More minor dismantling
with conclude this afternoon.
  
  377   Wednesday, June 12, 2013, 10:39 Travis CaveSouth Hot-CellStandard Operation  spent source tray removalThe spent source tray for TM#3 has been
removed from the south hot cell and well
be placed in the the hot cell ante room.
  
  378   Thursday, June 13, 2013, 09:18 chad fisherSouth Hot-CellRepairTM3 Source Tray/Extraction Column RemovalTM3 Rev 2 source tray/extraction column
insertion into its storage was completed
yesterday and it was then removed from the
  
  379   Thursday, June 13, 2013, 09:21 chad fisherSouth Hot-CellDevelopment  Warm Cell Mock-upthe warm cell mock-up has been inserted
into the warm cell and final preparation
for the remote test are being made.
 20130613_084421[1].jpg20130613_084426[1].jpg 
  380   Tuesday, June 18, 2013, 14:00 chad fisherSouth Hot-CellDevelopmentTM3 Mock-up testing / water block connectionsThe testing of the mock-up and tooling
has commenced.
Source tray mock-up has been driven
  
  381   Wednesday, June 19, 2013, 08:15 chad fisherSouth Hot-CellDevelopmentTM3 Mock up water block connectionsAll water block connections on the mock-up
have bben achieved. It is now ready for leak
checking.
 20130619_080806[1].jpg20130619_080808[1].jpg 
  383   Friday, June 21, 2013, 09:26 chad fisherSouth Hot-CellDevelopmentTM3 Mock-up Leak Check ResultsThe Mock-up has been leak tested after
the remote connection of the water blocks
and is leak tight!
  
  384   Tuesday, June 25, 2013, 13:20 Travis CaveSouth Hot-CellStandard OperationTM1UC#6Electrical checkResults from the electrical check of TM#1
with the UC#6 target. See attached PDF.
 TM#1_UC#6_SIS_Target_Elec_Chk.PDF 
  387   Wednesday, June 26, 2013, 11:03 David WangSouth Hot-CellStandard OperationTM1 Leak check on TM1 UCx target heat shieldChad and I leak checked the TM1 UCx target
heat shield at SHC. No leak has been found
so far.
  
  388   Thursday, June 27, 2013, 14:21 chad fisherSouth Hot-CellStandard OperationTM1Ucx#6Ucx#6 installed Ta#39? rewmovedUcx#6 was installed on TM1 on Wednesday.
Ta#39 was removed.
  