Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 336     Entry time: Friday, May 10, 2013, 09:26
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM3 
Target/Number:  
Subject: Containment box reinstalled 

the containment box has been reinstalled onto TM3. After electrical checks it is ready to move to the conditioning station...for electrical tests.

Attachment 1: IMG_1062[1].JPG  590 kB  | Show | Hide all
Attachment 2: IMG_1063[1].JPG  885 kB  | Show | Hide all
ELOG V2.9.2-2455