  2331   Monday, June 20, 2022, 18:03 Frank SongSouth Hot-CellStandard OperationTM2Sic#43electrical check

 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.

Attachment 1: TM2_with_SiC43.jpg
TM2_with_SiC43.jpg
  2335   Tuesday, June 21, 2022, 18:43 Frank SongNorth Hot-CellStandard OperationTM4UCx#37electrical check

 A p2n target in TM4 was electrical measured on NHC. see attachment pls.

Attachment 1: p2n_ucx37_electrical_check.jpg
p2n_ucx37_electrical_check.jpg
  2338   Thursday, June 23, 2022, 07:11 Frank SongNorth Hot-CellStandard OperationTM4Ta#64electrical check

 New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment.

Attachment 1: Ta#64.jpg
Ta#64.jpg
  2347   Tuesday, July 19, 2022, 11:53 Frank SongNorth Hot-CellStandard OperationTM2SiC#43 Febiadelectrical check

 A electrical check was done at NHC, see the pic attached with please.

Attachment 1: e_check_for_TM2_with_SiC43_Febiad.jpg
e_check_for_TM2_with_SiC43_Febiad.jpg
  2348   Thursday, July 21, 2022, 10:24 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check

 A electrical check was done for TM2 with UCx#38

Attachment 1: TM2_with_UCx38_echeck_on_NHC.jpg
TM2_with_UCx38_echeck_on_NHC.jpg
  2363   Thursday, September 08, 2022, 07:20 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 An electrical check was done on NHC yesterday.

Attachment 1: TM2_with_UCx#39_E_Check.png
TM2_with_UCx#39_E_Check.png
  2373   Tuesday, October 04, 2022, 07:19 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 an electrical was done for TM4 with target C#4 installed on NHC.

Attachment 1: tm4_with_C#4_installed.png
tm4_with_C#4_installed.png
  2382   Tuesday, November 01, 2022, 12:40 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

Attachment 1: electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
  2383   Wednesday, November 02, 2022, 11:11 Frank SongNorth Hot-CellStandard OperationTM2UCx#40electrical check

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Attachment 1: TM2_with_UCx40_electrical_check_on_NHC.png
TM2_with_UCx40_electrical_check_on_NHC.png
  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 TM4 with C#4 is checked on NHC right after moving from ITE.

Attachment 1: TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
  2456   Tuesday, June 13, 2023, 11:45 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

Attachment 1: TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png
  2466   Wednesday, July 19, 2023, 08:09 Frank SongNorth Hot-CellStandard OperationTM4UCx#42electrical check

 An electrical check was made after new target installed on TM4.

Attachment 1: E__check_after_UCx42_installed_on_TM4.pdf
E__check_after_UCx42_installed_on_TM4.pdf
  2481   Tuesday, August 29, 2023, 09:07 Frank SongITWRepairTM2Nb#11electrical check

 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.

Attachment 1: TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
  2491   Tuesday, October 03, 2023, 14:28 Frank SongSouth Hot-CellStandard OperationTM2Nb#11electrical check

 An electric checked right after TM2 was moved from ITW. 

Attachment 1: TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf
  2355   Wednesday, August 10, 2022, 08:10 Frank SongNorth Hot-CellStandard OperationTM4Sic#44electrical and leak check

 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 

Attachment 1: TM4_with_Sic#44_eletrical_and_leak_check.jpg
TM4_with_Sic#44_eletrical_and_leak_check.jpg
  2480   Monday, August 28, 2023, 12:16 Frank SongNorth Hot-CellRepairTM2Nb#11electric/leak check

 TM2 with new target Nb#11 has been E/L checked sitting on NHC.

Attachment 1: TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf
TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf
  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Attachment 1: TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
  2381   Tuesday, November 01, 2022, 12:37 Frank SongITWStandard OperationTM2UCx#39disconnection

 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.

Attachment 1: TM2_with_UCx39_disconnection_in_ITW.png
TM2_with_UCx39_disconnection_in_ITW.png
  791   Tuesday, November 18, 2014, 11:14 David WangSouth Hot-CellStandard Operation UCx11crane down UCx 11 target into SHC from TH

I craned down UCx11 target from TH into SHC. Chad was in SHC service area watching on it. The source tray moving jig was installed on the crane for this moving.

  2329   Thursday, June 09, 2022, 09:47 Matthew GareauSouth Hot-CellRepairTM2SiC#42containment box repair, Einzle lens, multi pin

On June 2 2022, while attempting to install target SiC#42 a gasket fell off the water line. I attempted to remove the target to have the gasket reattached, however the multi pin connector guide pin was loose and was preventing the target from being removed. During the attempt to remove the target it was noticed that an electrical cable in the back of the module had become loose and was dangling. The target was then secured to the module, and then the module was moved to the SHC to complete the job/repairs.

June 3 2022, containment box was removed, Einzle Lens cable reattached and tested, and the multi pin guide pin was retightened.

On June 6 2022, the containment box was damaged while lifting the containment box back onto the module.

The left rear corner of the box caught on the module and the corner weld snapped and folded the corner down about 90 degrees.

With help from Chad, we were able to restraighten the corner with a C-clamp, enabling the box to be reattached to the module.

However the 2 bolts that were on the corner that attach to the module were not able to be aligned and were not used.

The target was reattached to the module, and to save time was brought directly to ITW, skipping the conditioning station. 