Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2347     Entry time: Tuesday, July 19, 2022, 11:53
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: SiC#43 Febiad 
Subject: electrical check 

 A electrical check was done at NHC, see the pic attached with please.

Attachment 1: e_check_for_TM2_with_SiC43_Febiad.jpg  731 kB  | Show | Hide all
ELOG V2.9.2-2455