Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2347
Entry time:
Tuesday, July 19, 2022, 11:53
Author:
Frank Song
Category:
North Hot-Cell
Type:
Standard Operation
Module:
TM2
Target/Number:
SiC#43 Febiad
Subject:
electrical check
A electrical check was done at NHC, see the pic attached with please.
Attachment 1:
e_check_for_TM2_with_SiC43_Febiad.jpg
731 kB
|
Show
|
Hide all
ELOG V2.9.2-2455