Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2383     Entry time: Wednesday, November 02, 2022, 11:11
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: UCx#40 
Subject: electrical check 

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Attachment 1: TM2_with_UCx40_electrical_check_on_NHC.png  160 kB  | Show | Hide all
ELOG V2.9.2-2455