Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2382     Entry time: Tuesday, November 01, 2022, 12:40
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: UCx#39 
Subject: electrical check 

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

Attachment 1: electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png  151 kB  | Show | Hide all
ELOG V2.9.2-2455