Entry  Monday, June 20, 2022, 18:03, Frank Song, South Hot-Cell, Standard Operation, TM2, Sic#43, electrical check TM2_with_SiC43.jpg

 TM2 with new target SiC#43 was electrical checked at SHC. please see attachment.

Entry  Tuesday, June 21, 2022, 18:43, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#37, electrical check p2n_ucx37_electrical_check.jpg

 A p2n target in TM4 was electrical measured on NHC. see attachment pls.

Entry  Thursday, June 23, 2022, 07:11, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#64, electrical check Ta#64.jpg

 New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment.

Entry  Tuesday, July 19, 2022, 11:53, Frank Song, North Hot-Cell, Standard Operation, TM2, SiC#43 Febiad, electrical check e_check_for_TM2_with_SiC43_Febiad.jpg

 A electrical check was done at NHC, see the pic attached with please.

Entry  Thursday, July 21, 2022, 10:24, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check TM2_with_UCx38_echeck_on_NHC.jpg

 A electrical check was done for TM2 with UCx#38

Entry  Thursday, September 08, 2022, 07:20, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check TM2_with_UCx#39_E_Check.png

 An electrical check was done on NHC yesterday.

Entry  Tuesday, October 04, 2022, 07:19, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check tm4_with_C#4_installed.png

 an electrical was done for TM4 with target C#4 installed on NHC.

Entry  Tuesday, November 01, 2022, 12:40, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

Entry  Wednesday, November 02, 2022, 11:11, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#40, electrical check TM2_with_UCx40_electrical_check_on_NHC.png

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Entry  Tuesday, November 22, 2022, 12:41, Frank Song, North Hot-Cell, Standard Operation, TM4, C#4, electrical check TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png

 TM4 with C#4 is checked on NHC right after moving from ITE.

Entry  Tuesday, June 13, 2023, 11:45, Frank Song, North Hot-Cell, Standard Operation, TM4, TiC#5, electrical check TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

Entry  Wednesday, July 19, 2023, 08:09, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#42, electrical check E__check_after_UCx42_installed_on_TM4.pdf

 An electrical check was made after new target installed on TM4.

Entry  Tuesday, August 29, 2023, 09:07, Frank Song, ITW, Repair, TM2, Nb#11, electrical check TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf

 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.

Entry  Tuesday, October 03, 2023, 14:28, Frank Song, South Hot-Cell, Standard Operation, TM2, Nb#11, electrical check TM2_with_spent_target_Nb#11_electrical_check_right_after_moving_from_ITW_to_SHC.pdf

 An electric checked right after TM2 was moved from ITW. 

Entry  Wednesday, August 10, 2022, 08:10, Frank Song, North Hot-Cell, Standard Operation, TM4, Sic#44, electrical and leak check  TM4_with_Sic#44_eletrical_and_leak_check.jpg

 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 

Entry  Monday, August 28, 2023, 12:16, Frank Song, North Hot-Cell, Repair, TM2, Nb#11, electric/leak check TM2_with_Nb#11_electical_and_leak_check_in_NHC_2023-08-28.pdf

 TM2 with new target Nb#11 has been E/L checked sitting on NHC.

Entry  Wednesday, November 23, 2022, 11:27, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#41, electric and leak check after new target installed TM4_with_UCx#41_electric_and_leak_check_on_NHC.png

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Entry  Tuesday, November 01, 2022, 12:37, Frank Song, ITW, Standard Operation, TM2, UCx#39, disconnection TM2_with_UCx39_disconnection_in_ITW.png

 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.

Entry  Tuesday, November 18, 2014, 11:14, David Wang, South Hot-Cell, Standard Operation, , UCx11, crane down UCx 11 target into SHC from TH 

I craned down UCx11 target from TH into SHC. Chad was in SHC service area watching on it. The source tray moving jig was installed on the crane for this moving.

Entry  Thursday, June 09, 2022, 09:47, Matthew Gareau, South Hot-Cell, Repair, TM2, SiC#42, containment box repair, Einzle lens, multi pin 

On June 2 2022, while attempting to install target SiC#42 a gasket fell off the water line. I attempted to remove the target to have the gasket reattached, however the multi pin connector guide pin was loose and was preventing the target from being removed. During the attempt to remove the target it was noticed that an electrical cable in the back of the module had become loose and was dangling. The target was then secured to the module, and then the module was moved to the SHC to complete the job/repairs.

June 3 2022, containment box was removed, Einzle Lens cable reattached and tested, and the multi pin guide pin was retightened.

On June 6 2022, the containment box was damaged while lifting the containment box back onto the module.

The left rear corner of the box caught on the module and the corner weld snapped and folded the corner down about 90 degrees.

With help from Chad, we were able to restraighten the corner with a C-clamp, enabling the box to be reattached to the module.

However the 2 bolts that were on the corner that attach to the module were not able to be aligned and were not used.

The target was reattached to the module, and to save time was brought directly to ITW, skipping the conditioning station. 